532
Views
16
CrossRef citations to date
0
Altmetric
Original Articles

Improving the accuracy estimates of building of approximate projects

Pages 312-318 | Published online: 18 Oct 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (3)

Johnson Adafin, James O.B. Rotimi & Suzanne Wilkinson. (2020) Risk impact assessments in project budget development: quantity surveyors' perspectives. International Journal of Construction Management 20:1, pages 13-28.
Read now
Johnson Adafin, James O.B. Rotimi & Suzanne Wilkinson. (2016) Risk impact assessments in project budget development: architects’ perspectives. Architectural Engineering and Design Management 12:3, pages 189-204.
Read now
Ajibade Ayodeji Aibinu & Thomas Pasco. (2008) The accuracy of pre‐tender building cost estimates in Australia. Construction Management and Economics 26:12, pages 1257-1269.
Read now

Articles from other publishers (13)

Johnson Adafin, James O.B. Rotimi & Suzanne Wilkinson. (2020) An evaluation of risk factors impacting project budget performance in New Zealand. Journal of Engineering, Design and Technology 19:1, pages 41-61.
Crossref
Opeoluwa Israel Akinradewo, Clinton Ohis Aigbavboa & Ayodeji Emmanuel Oke. (2020) Improving accuracy of road projects’ estimates in the Ghanaian construction industry. Journal of Financial Management of Property and Construction 25:3, pages 407-421.
Crossref
Opeoluwa Akinradewo, Clinton Aigbavboa & Ayodeji Oke. (2020) Accuracy of road construction preliminary estimate: examining the influencing factors. Built Environment Project and Asset Management 10:5, pages 657-671.
Crossref
Tala Hassan Dandan, Ghaleb Sweis, Lilana Salem Sukkari & Rateb J. Sweis. (2019) Factors affecting the accuracy of cost estimate during various design stages. Journal of Engineering, Design and Technology 18:4, pages 787-819.
Crossref
Olalekan Shamsideen Oshodi & Ka Chi Lam. 2018. Fuzzy Hybrid Computing in Construction Engineering and Management. Fuzzy Hybrid Computing in Construction Engineering and Management 389 411 .
Johnson AdafinJames O. B. RotimiSuzanne Wilkinson. (2016) Determining Significant Risks in the Variability between Design-Stage Elemental Cost Plan and Final Tender Sum. Journal of Management in Engineering 32:6.
Crossref
Lim Yoke Mui, Yahaya Ahmad & Faezeh Nabavi. (2016) Causes of high variance in building conservation tenders in Malaysia. Structural Survey 34:2, pages 98-116.
Crossref
Brendon Lim, Madhav P. Nepal, Martin Skitmore & Bo Xiong. (2016) Drivers of the accuracy of developers’ early stage cost estimates in residential construction. Journal of Financial Management of Property and Construction 21:1, pages 4-20.
Crossref
Johnson Adafin, James O.B. Rotimi & Suzanne Wilkinson. (2015) Why do the design stage elemental cost plan and final tender sum differ in New Zealand?. Journal of Financial Management of Property and Construction 20:2, pages 116-131.
Crossref
Ajibade A. Aibinu, Dharma Dassanayake, Toong-Khuan Chan & Ram Thangaraj. (2015) Cost estimation for electric light and power elements during building design. Engineering, Construction and Architectural Management 22:2, pages 190-213.
Crossref
Mohd Azrai Azman, Zulkiflee Abdul-Samad & Suraya Ismail. (2013) The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia. International Journal of Project Management 31:7, pages 994-1005.
Crossref
Hyung-Jin Kim, Yong-Chil Seo & Chang-Taek Hyun. (2012) A hybrid conceptual cost estimating model for large building projects. Automation in Construction 25, pages 72-81.
Crossref
Li LiuKai Zhu. (2007) Improving Cost Estimates of Construction Projects Using Phased Cost Factors. Journal of Construction Engineering and Management 133:1, pages 91-95.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.