Heuristic procedures for resource—constrained project scheduling with minimal and maximal time lags: the resource—levelling and minimum project—duration problems

&
Pages 129-155 | Published online: 31 May 2012

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (1)

M Ranjbar. (2013) A path-relinking metaheuristic for the resource levelling problem. Journal of the Operational Research Society 64:7, pages 1071-1078.
Read now

Articles from other publishers (39)

Abbas Sayyadi, Hamid Esmaeeli & Amir Hossein Hosseinian. (2022) A community detection approach for the resource leveling problem in a multi-project scheduling environment. Computers & Industrial Engineering 169, pages 108202.
Crossref
Madiha Harrabi, Olfa Belkahla Driss & Khaled Ghedira. (2021) A hybrid evolutionary approach to job-shop scheduling with generic time lags. Journal of Scheduling 24:3, pages 329-346.
Crossref
Gündüz Ulusoy & Öncü HazırGündüz Ulusoy & Öncü Hazır. 2021. An Introduction to Project Modeling and Planning. An Introduction to Project Modeling and Planning 251 280 .
Zhixiong Su. (2018) Invisible consumptions and enlargements of activity floats under generalized precedence relations. Soft Computing 23:21, pages 10837-10852.
Crossref
Zihao Chu, Zhe Xu & Fang Xie. (2018) Experimental Evaluation of Overlapping Strategy for the Multimode Resource-Constrained Project Scheduling Problem. Arabian Journal for Science and Engineering 44:3, pages 2503-2517.
Crossref
Stefan Kreter, Andreas Schutt, Peter J. Stuckey & Jürgen Zimmermann. (2018) Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems. European Journal of Operational Research 266:2, pages 472-486.
Crossref
Symeon E. Christodoulou. (2017) Entropy-Based Heuristic for Resource-Constrained Project Scheduling. Journal of Computing in Civil Engineering 31:3.
Crossref
Zhi-Xiong Su, Jian-Xun Qi & Zhi-Nan Kan. (2016) Simplifying activity networks under generalized precedence relations to extended CPM networks. International Transactions in Operational Research 23:6, pages 1141-1161.
Crossref
Aria Shahsavar, Amir Abbas Najafi & Seyed Taghi Akhavan Niaki. (2015) Three self-adaptive multi-objective evolutionary algorithms for a triple-objective project scheduling problem. Computers & Industrial Engineering 87, pages 4-15.
Crossref
Mohammed Abdul RahmanAshraf Elazouni. (2015) Devising extended-duration schedules of enhanced resource leveling. Canadian Journal of Civil Engineering 42:8, pages 552-562.
Crossref
Miguel A. González, Angelo Oddi, Riccardo Rasconi & Ramiro Varela. (2015) Scatter search with path relinking for the job shop with time lags and setup times. Computers & Operations Research 60, pages 37-54.
Crossref
Symeon E. Christodoulou, Anastasia Michaelidou-Kamenou & Georgios Ellinas. 2015. Handbook on Project Management and Scheduling Vol.1. Handbook on Project Management and Scheduling Vol.1 389 407 .
Behrouz Afshar-Nadjafi, Zeinab Khalaj & Esmaeil Mehdizadeh. (2013) A Branch and Bound Approach to Solve the Preemptive Resource Leveling Problem. International Journal of Manufacturing Engineering 2013, pages 1-7.
Crossref
Jose Luis Ponz-Tienda, Víctor Yepes, Eugenio Pellicer & Joaquin Moreno-Flores. (2013) The Resource Leveling Problem with multiple resources using an adaptive genetic algorithm. Automation in Construction 29, pages 161-172.
Crossref
P. Lacomme, N. Tchernev & M. J. Huguet. (2011) Dedicated constraint propagation for Job-Shop problem with generic time-lags. Dedicated constraint propagation for Job-Shop problem with generic time-lags.
Jan Węglarz, Joanna Józefowska, Marek Mika & Grzegorz Waligóra. (2011) Project scheduling with finite or infinite number of activity processing modes – A survey. European Journal of Operational Research 208:3, pages 177-205.
Crossref
Ming Ni, P.B. Luh & B. Moser. (2008) An Optimization-Based Approach for Design Project Scheduling. IEEE Transactions on Automation Science and Engineering 5:3, pages 394-406.
Crossref
Anthony Caumond, Philippe Lacomme & Nikolay Tchernev. (2008) A memetic algorithm for the job-shop with time-lags. Computers & Operations Research 35:7, pages 2331-2356.
Crossref
. 2008. Resource‐Constrained Project Scheduling. Resource‐Constrained Project Scheduling 279 301 .
Gwo-Ji Sheen & Lu-Wen Liao. (2007) A branch and bound algorithm for the one-machine scheduling problem with minimum and maximum time lags. European Journal of Operational Research 181:1, pages 102-116.
Crossref
Martin Morlock, Christoph Schwindt, Jürgen Zimmermann & Norbert Trautmann. 2006. Perspectives on Operations Research. Perspectives on Operations Research 1 13 .
L.R. Foulds & J.M. Wilson. (2005) Scheduling operations for the harvesting of renewable resources. Journal of Food Engineering 70:3, pages 281-292.
Crossref
J. L. CORNER & L. R. FOULDS. (2011) SCHEDULING THE HARVESTING OPERATIONS OF A FOREST BLOCK: A CASE STUDY. Asia-Pacific Journal of Operational Research 22:03, pages 377-390.
Crossref
A. Lim, B Rodrigues, R. Thangarajoo & F. Xiao. (2004) A Hybrid Framework for Over-Constrained Generalized. Artificial Intelligence Review 22:3, pages 211-243.
Crossref
Johann Hurink & Jens Keuchel. (2001) Local search algorithms for a single-machine scheduling problem with positive and negative time-lags. Discrete Applied Mathematics 112:1-3, pages 179-197.
Crossref
R Kolisch & R Padman. (2001) An integrated survey of deterministic project scheduling. Omega 29:3, pages 249-272.
Crossref
K. Neumann & J. Zimmermann. (2000) Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints. European Journal of Operational Research 127:2, pages 425-443.
Crossref
Ulrich Dorndorf, Erwin Pesch & Toàn Phan-Huy. (2000) A Time-Oriented Branch-and-Bound Algorithm for Resource-Constrained Project Scheduling with Generalised Precedence Constraints. Management Science 46:10, pages 1365-1384.
Crossref
Andreas Drexl, Rüdiger Nissen, James H. Patterson & Frank Salewski. (2000) ProGen/πx – An instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions. European Journal of Operational Research 125:1, pages 59-72.
Crossref
Bert De Reyck & Willy Herroelen. (1999) The multi-mode resource-constrained project scheduling problem with generalized precedence relations. European Journal of Operational Research 119:2, pages 538-556.
Crossref
K. Neumann & J. Zimmermann. (1999) Resource levelling for projects with schedule-dependent time windows. European Journal of Operational Research 117:3, pages 591-605.
Crossref
Peter Brucker, Thomas Hilbig & Johann Hurink. (1999) A branch and bound algorithm for a single-machine scheduling problem with positive and negative time-lags. Discrete Applied Mathematics 94:1-3, pages 77-99.
Crossref
Peter Brucker, Andreas Drexl, Rolf Möhring, Klaus Neumann & Erwin Pesch. (1999) Resource-constrained project scheduling: Notation, classification, models, and methods. European Journal of Operational Research 112:1, pages 3-41.
Crossref
Bert De Reyck, Erik Demeulemeester & Willy Herroelen. 1999. Project Scheduling. Project Scheduling 77 105 .
Klaus Neumann & Jürgen Zimmermann. 1999. Project Scheduling. Project Scheduling 261 287 .
Bert De Reyck & willy Herroelen. (1998) A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations. European Journal of Operational Research 111:1, pages 152-174.
Crossref
Bert De Reyck & Willy Herroelen. (1998) An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations. Computers & Operations Research 25:1, pages 1-17.
Crossref
Klaus Neumann & Christoph Schwindt. (1997) Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production. OR Spektrum 19:3, pages 205-217.
Crossref
Birger Franck, Klaus Neumann & Christoph Schwindt. (1997) A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods. OR Spektrum 19:2, pages 77-85.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.