770
Views
20
CrossRef citations to date
0
Altmetric
Original Articles

Equipment size effects on open pit mining performance

Pages 41-56 | Published online: 04 Aug 2006

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (7)

E. Tapia, A. Salazar Araya, N. Saavedra, M. Nehring & J. Mora. (2021) An analysis of full truck versus full bucket strategies in open pit mining loading and hauling operations. International Journal of Mining, Reclamation and Environment 35:1, pages 1-11.
Read now
Weldegebrial Haile, Bheemalingeswara Konka & Zerihun Desta. (2020) Evaluation of mining and mineral processing methods’ impact on tantalite concentrate in Kenticha open pit mine, southern Ethiopia. Applied Earth Science 129:4, pages 205-216.
Read now
Morteza Osanloo & Morteza Paricheh. (2020) In-pit crushing and conveying technology in open-pit mining operations: a literature review and research agenda. International Journal of Mining, Reclamation and Environment 34:6, pages 430-457.
Read now
Hamidreza Nourali & Morteza Osanloo. (2020) A regression-tree-based model for mining capital cost estimation. International Journal of Mining, Reclamation and Environment 34:2, pages 88-100.
Read now
Morteza Paricheh, Morteza Osanloo & Mehdi Rahmanpour. (2018) A heuristic approach for in-pit crusher and conveyor system’s time and location problem in large open-pit mining. International Journal of Mining, Reclamation and Environment 32:1, pages 35-55.
Read now
Preetham Nayak, Michael Hitch & Andrew Bamber. (2017) Increasing the value of heterogeneous ore deposits by high-resolution deposit-modelling and flexible extraction techniques. Mining Technology 126:3, pages 139-150.
Read now
Rodrigo Pascual, Rodrigo Madariaga, Gabriel Santelices, David Godoy & Enrique Lopez Droguett. (2016) A structured methodology to optimise throughput of production lines. International Journal of Mining, Reclamation and Environment 30:1, pages 25-36.
Read now

Articles from other publishers (13)

Shabbir Ahmad. (2023) Innovation and Drivers of Productivity: A Global Analysis of Selected Critical Minerals. Commodities 2:4, pages 417-432.
Crossref
Nikola Stanić, Miljan Gomilanović, Saša Stepanović & Aleksandar Doderović. (2023) Selection the optimal truck model for transport of by-products from the TPP Pljevlja to the Maljevac landfill. Mining and Metallurgy Engineering Bor:1, pages 49-58.
Crossref
José Charango Munizaga-Rosas & Elmer Luque Percca. 2022. Advanced Analytics in Mining Engineering. Advanced Analytics in Mining Engineering 557 612 .
Hongquan Guo, Hoang Nguyen, Diep-Anh Vu & Xuan-Nam Bui. (2021) Forecasting mining capital cost for open-pit mining projects based on artificial neural network approach. Resources Policy 74, pages 101474.
Crossref
Yanbiao Feng & Zuomin Dong. (2019) Optimal control of natural gas compression engine hybrid electric mining trucks for balanced fuel efficiency and overall emission improvement. Energy 189, pages 116276.
Crossref
Christina N. Burt & Louis Caccetta. 2018. Equipment Selection for Mining: With Case Studies. Equipment Selection for Mining: With Case Studies 25 51 .
Christina N. Burt & Louis Caccetta. 2018. Equipment Selection for Mining: With Case Studies. Equipment Selection for Mining: With Case Studies 11 23 .
Christina N. Burt & Louis Caccetta. 2018. Equipment Selection for Mining: With Case Studies. Equipment Selection for Mining: With Case Studies 3 9 .
Julian Ramirez Ruiseco & Mustafa Kumral. (2016) A Practical Approach to Mine Equipment Sizing in Relation to Dig-Limit Optimization in Complex Orebodies: Multi-Rock Type, Multi-Process, and Multi-Metal Case. Natural Resources Research 26:1, pages 23-35.
Crossref
Yuming Yin, Subhash Rakheja & Paul-Emile Boileau. (2016) A roll stability performance measure for off-road vehicles. Journal of Terramechanics 64, pages 58-68.
Crossref
Christina N. Burt & Lou Caccetta. (2014) Equipment Selection for Surface Mining: A Review. Interfaces 44:2, pages 143-162.
Crossref
Jacek Czaplicki. 2008. Shovel-Truck Systems. Shovel-Truck Systems 149 156 .
A. H. Kashani, W. S. Owen, P. D. Lawrence & R. A. Hall. (2007) Real-Time Robot Joint Variable Extraction from a Laser Scanner. Real-Time Robot Joint Variable Extraction from a Laser Scanner.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.