285
Views
9
CrossRef citations to date
0
Altmetric
Articles

Automated estimation of completion time for dam projects

, , &

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (1)

Tariq Shehab, Nigel Blampied, Elhami Nasr & Laxmi Sindhu. (2023) ANN-based estimation model for the preconstruction cost of pavement rehabilitation projects. International Journal of Construction Management 0:0, pages 1-8.
Read now

Articles from other publishers (8)

Jemima Yarnold, Saeed Banihashemi, Charles Lemckert & Hamed Golizadeh. (2021) Building and construction quality: systematic literature review, thematic and gap analysis. International Journal of Building Pathology and Adaptation 41:5, pages 942-964.
Crossref
Abdulwahed Fazeli, Saeed Banihashemi, Aso Hajirasouli & Saeed Reza Mohandes. (2022) Automated 4D BIM development: the resource specification and optimization approach. Engineering, Construction and Architectural Management.
Crossref
Ali Mohammad Mirzaee, M. Reza Hossieni & Igor Martek. (2022) Optimal Buyer Credit Arrangements for Chinese Procured Dam-building Projects: An Iranian Perspective. KSCE Journal of Civil Engineering 26:12, pages 4984-4996.
Crossref
Meseret Getnet Meharie, Wubshet Jekale Mengesha, Zachary Abiero Gariy & Raphael N.N. Mutuku. (2021) Application of stacking ensemble machine learning algorithm in predicting the cost of highway construction projects. Engineering, Construction and Architectural Management 29:7, pages 2836-2853.
Crossref
Jakub Horak, Veronika Machova & Jaromir Vrbka. 2021. Handbook of Research on Financial Management During Economic Downturn and Recovery. Handbook of Research on Financial Management During Economic Downturn and Recovery 126 152 .
Meseret Getnet Meharie, Zachary C. Abiero Gariy, Raphael Ngumbau Ndisya Mutuku & Wubshet Jekale Mengesha. (2019) Prioritizing Key Duration Estimation Accuracy Factors in Highway Infrastructure Projects Using Fuzzy AHP. The Open Civil Engineering Journal 13:1, pages 92-108.
Crossref
Karrar Raoof Kareem Kamoona & Cenk Budayan. (2019) Implementation of Genetic Algorithm Integrated with the Deep Neural Network for Estimating at Completion Simulation. Advances in Civil Engineering 2019, pages 1-15.
Crossref
Enas Fathi Taher Al Hares & Cenk Budayan. (2019) Estimation at Completion Simulation Using the Potential of Soft Computing Models: Case Study of Construction Engineering Projects. Symmetry 11:2, pages 190.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.