994
Views
21
CrossRef citations to date
0
Altmetric
Original Articles

Investigating the types, causes and severity of claims in construction projects in the UAE

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (2)

Sy Tien Do, Viet Thanh Nguyen, Cuong N. N. Tran & Zwe Man Aung. (2023) Identifying and evaluating the key claim causes leading to construction delays. International Journal of Construction Management 23:12, pages 1999-2011.
Read now
Abbas Tajaddini, Ali Paydar, Hamidreza Abbasianjahromi & Zahir Azami. (2023) Analysis of the damage indexes of construction projects using a hybrid fuzzy method. International Journal of Construction Management 23:10, pages 1694-1703.
Read now

Articles from other publishers (19)

Sy Tien Do, Viet Thanh Nguyen & Nghia Hoai Nguyen. (2022) Relationship networks between variation orders and claims/disputes causes on construction project performance and stakeholder performance. Engineering, Construction and Architectural Management 30:9, pages 3817-3839.
Crossref
Peter Dodzi Kwasi Agbaxode, Ehsan Saghatforoush & Sitsabo Dlamini. (2023) Capabilities required of the conventional project delivery (CPD) approach in producing quality design documentation: the Ghanaian construction industry perspective. Journal of Engineering, Design and Technology.
Crossref
Longhui LiaoNana WeiChuchu ZhengYuehua YeYun Chen. (2023) Understanding Causes for Construction Claims in Hydropower Projects. Journal of Management in Engineering 39:5.
Crossref
Murat Cevikbas & Zeynep Işık. (2022) Detecting the most appropriate delay analysis methods for mega airport projects. Engineering, Construction and Architectural Management 30:6, pages 2463-2480.
Crossref
Ramin Asadi, James Olabode Bamidele Rotimi & Suzanne Wilkinson. (2023) Analyzing Underlying Factors of Rework in Generating Contractual Claims in Construction Projects. Journal of Construction Engineering and Management 149:6.
Crossref
Jinpeng Wang, Shang ZhangRuoyu Jin, Peter FennDongwen YuLilin Zhao. (2023) Identifying Critical Dispute Causes in the Construction Industry: A Cross-Regional Comparative Study between China and the UK. Journal of Management in Engineering 39:2.
Crossref
Jinpeng Wang, Shang ZhangPeter FennXiaowei LuoYan Liu & Lilin Zhao. (2023) Adopting BIM to Facilitate Dispute Management in the Construction Industry: A Conceptual Framework Development. Journal of Construction Engineering and Management 149:1.
Crossref
Faris Elghaish, Farzad Pour Rahimian, Tara Brooks, Nashwan Dawood & Sepehr AbrishamiFaris Elghaish, Farzad Pour Rahimian, Tara Brooks, Nashwan Dawood & Sepehr Abrishami. 2023. Blockchain of Things and Deep Learning Applications in Construction. Blockchain of Things and Deep Learning Applications in Construction 41 66 .
Kyong Ju Kim, Bonghee Han, Min Seo Park, Kyoungmin Kim & Eu Wang Kim. (2022) Application Issues of Impacted As-Planned Schedule for Delay Analysis. Buildings 12:9, pages 1442.
Crossref
Do Tien Sy, Zwe Man Aung & Nguyen Thanh Viet. 2022. Sustainability Management Strategies and Impact in Developing Countries. Sustainability Management Strategies and Impact in Developing Countries 45 60 .
Wenbao Wang, Iwan Harsono, Chich-Jen Shieh, Vadim Samusenkov & Shahab Shoar. (2022) Identification of critical paths leading to cost claims for underground metro projects: a system dynamics approach. Kybernetes.
Crossref
Ramin Asadi, James Olabode Bamidele RotimiSuzanne Wilkinson. (2022) Investigating the Relationship between Reworks and Contractual Claims: The Salience of Contract Conditions. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction 14:1.
Crossref
Peter Dodzi Kwasi Agbaxode, Sitsabo Dlamini & Ehsan Saghatforoush. (2021) Quality of Design Documentation in the Construction Industry: A Review Using Meta-Synthesis Approach. International Journal of Innovation and Technology Management 18:06.
Crossref
Junmo Park & Deokseok Seo. (2021) Defect Index of Timberwork in House, Korea. Forests 12:7, pages 896.
Crossref
Deena Badran, Radhi AlZubaidi & Senthilkumar Venkatachalam. (2020) BIM based risk management for design bid build (DBB) design process in the United Arab Emirates: a conceptual framework. International Journal of System Assurance Engineering and Management 11:6, pages 1339-1361.
Crossref
Ihsan Issa Ahmad Al Hosani, Fikri T. Dweiri & Udechukwu Ojiako. (2020) A study of cost overruns in complex multi-stakeholder road projects in the United Arab Emirates. International Journal of System Assurance Engineering and Management 11:6, pages 1250-1259.
Crossref
Essam Zaneldin, Omar Al Khatib & Waleed Ahmed. (2020) Investigating the use of no-dig technologies for underground utilities in developing countries. Innovative Infrastructure Solutions 5:1.
Crossref
Sadi Assaf, Mohammad A. Hassanain, Abdullatif Abdallah, Ahmed M.Z. Sayed & Abdulrahman Alshahrani. (2019) Significant causes of claims and disputes in construction projects in Saudi Arabia. Built Environment Project and Asset Management 9:5, pages 597-615.
Crossref
Vasila Al Khaldi, Nazar Zaki, Essam Zaneldin & Elfadil A. Mohamed. (2019) Using Data Mining Techniques to Identify Construction Claims Causes: A Case Study. Using Data Mining Techniques to Identify Construction Claims Causes: A Case Study.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.