907
Views
28
CrossRef citations to date
0
Altmetric
Original Articles

A statistical approach to assess the schedule delays and risks in Indian construction industry

, , ORCID Icon &

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (12)

Adriana Gómez-Cabrera, Laura Gutierrez-Bucheli & Santiago Muñoz. (2023) Causes of time and cost overruns in construction projects: a scoping review. International Journal of Construction Management 0:0, pages 1-19.
Read now
D. C. Beardmore & Keith R. Molenaar. (2023) Roadway design and construction in infrastructure limited contexts: a risk breakdown structure. International Journal of Construction Management 23:10, pages 1675-1683.
Read now
Kyung-Tae Lee, Sang-Jun Park & Ju-Hyung Kim. (2023) Comparative analysis of managers’ perception in overseas construction project risks and cost overrun in actual cases: a perspective of the Republic of Korea. Journal of Asian Architecture and Building Engineering 22:4, pages 2291-2308.
Read now
Adel Rafieyan, Hadi Sarvari, Michael Beer & Daniel W. M. Chan. (2022) Determining the effective factors leading to incidence of human error accidents in industrial parks construction projects: results of a fuzzy Delphi survey. International Journal of Construction Management 0:0, pages 1-13.
Read now
Onur Selcuk, Harun Turkoglu, Gul Polat & Miklós Hajdu. (2022) An integrative literature review on the causes of delays in construction projects: evidence from developing countries. International Journal of Construction Management 0:0, pages 1-13.
Read now
David Kelly & Benedict Ilozor. (2022) Performance outcome assessment of the integrated project delivery (IPD) method for commercial construction projects in USA. International Journal of Construction Management 22:14, pages 2808-2816.
Read now
Muzammil Bepari, Balkrishna E. Narkhede & Rakesh D. Raut. (2022) A comparative study of project risk management with risk breakdown structure (RBS): a case of commercial construction in India. International Journal of Construction Management 0:0, pages 1-10.
Read now
Riaz Ahmed, Abrar Hussain & Simon P. Philbin. (2022) Moderating Effect of Senior Management Support on the Relationship Between Schedule Delay Factors and Project Performance. Engineering Management Journal 34:3, pages 374-393.
Read now
Ari Sandhyavitri. (2022) Stochastic analyses for managing risk of delay in Duri oil construction projects, Indonesia. International Journal of Construction Management 22:4, pages 711-731.
Read now
Nazia Rasul, Muhammad Sohail Anwar Malik, Beenish Bakhtawar & Muhammad Jamaluddin Thaheem. (2021) Risk assessment of fast-track projects: a systems-based approach. International Journal of Construction Management 21:11, pages 1099-1114.
Read now
Maria Krechowicz (née Gierczak). (2021) The hybrid Fuzzy Fault and Event Tree analysis in the geotechnical risk management in HDD projects. Georisk: Assessment and Management of Risk for Engineered Systems and Geohazards 15:1, pages 12-26.
Read now

Articles from other publishers (16)

Nilufer Noushad, S. Jawahar Saud & Shamnas Neduvancheri. 2024. Proceedings of SECON’23. Proceedings of SECON’23 103 116 .
Muhammad Nadeem, Izhar Mithal Jiskani, Muhammad Salman Urwat, Salah Uddin, Kamran Akhtar & Nadar Hussain Khokhar. (2023) Analysing delay factors in construction projects using Z-number approach: insights from Pakistan. Canadian Journal of Civil Engineering 50:12, pages 966-983.
Crossref
Noopur. (2023) Identifying the stressors hindering performance in the Indian construction industry: an empirical investigation. Engineering, Construction and Architectural Management.
Crossref
Tang Xinfa, Zhong Tian, Huang Xingwu & Li Dan. (2023) Research on construction schedule risk management of power supply and distribution projects based on MCS-AHP model. Frontiers in Energy Research 10.
Crossref
Sidra Muzaffar, Khurram Iqbal Ahmad Khan, Muhammad Bilal Tahir & Hamna Bukhari. (2022) Analysing the Causes of Design Generated Waste through System Dynamics. KSCE Journal of Civil Engineering 26:12, pages 4912-4925.
Crossref
Long Chen, Qiuchen Lu & Daguang Han. (2022) A Bayesian-driven Monte Carlo Approach for Managing Construction Schedule Risks of Infrastructures Under Uncertainty. Expert Systems with Applications, pages 118810.
Crossref
Afia Malik, Khurram Iqbal Ahmad Khan, Siddra Qayyum, Fahim Ullah & Ahsen Maqsoom. (2022) Resilient Capabilities to Tackle Supply Chain Risks: Managing Integration Complexities in Construction Projects. Buildings 12:9, pages 1322.
Crossref
Qing’e Wang & Jing Wang. (2022) Research on Key Risk Factors and Risk Transmission Path of Procurement in International Engineering Procurement Construction Project. Buildings 12:5, pages 534.
Crossref
Ari Sandhyavitri, Arvin Arvin & Fajar Restuhadi. (2022) Simulations of the Crude Oil Tank Refurbishment Project Risks Using Monte Carlo. Journal of Applied Materials and Technology 3:1, pages 22-29.
Crossref
Arpit Singh, Subhas C. Misra, Vinod Kumar & Uma Kumar. (2021) Identification and ordering of safety performance indicators using fuzzy TOPSIS: a case study in Indian construction company. International Journal of Quality & Reliability Management 39:1, pages 77-114.
Crossref
Mohammad Ajmal Nikjow, Li Liang, Xijing Qi, Samad M. E. Sepasgozar & Nicholas Chileshe. (2021) Triggers of Delays in International Projects Using Engineering Procurement and Construction Delivery Methods in the Belt and Road Initiative: Case Study of a High-Speed Railway Projects. Sustainability 13:17, pages 9503.
Crossref
Muhammad Bilal Tahir, Khurram Iqbal Ahmad Khan & Abdur Rehman Nasir. (2021) Tacit knowledge sharing in construction: a system dynamics approach. Asian Journal of Civil Engineering 22:4, pages 605-625.
Crossref
Aliyeh Kazemi, Eun-Seok Kim & Mohammad-Hossein Kazemi. (2020) Identifying and prioritizing delay factors in Iran’s oil construction projects. International Journal of Energy Sector Management 15:3, pages 476-495.
Crossref
Mohammad Barqawi, Heap-Yih Chong & Emil Jonescu. (2021) A Review of Employer-Caused Delay Factors in Traditional and Building Information Modeling (BIM)-Enabled Projects: Research Framework. Advances in Civil Engineering 2021, pages 1-24.
Crossref
Long Chen, Qiuchen Lu & Daguang Han. (2022) A Bayesian-Driven Monte Carlo Approach for Managing Construction Schedule Risks of Infrastructures Under Uncertainty. SSRN Electronic Journal.
Crossref
Riaz Ahmed, Abrar Hussain & Simon P. Philbin. (2021) Moderating Effect of Senior Management Support on the Relationship Between Schedule Delay Factors and Project Performance. SSRN Electronic Journal.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.