388
Views
8
CrossRef citations to date
0
Altmetric
Articles

Quantifying eco-efficiency within life cycle management using a process model of strip coal mining

Pages 258-273 | Received 22 Dec 2010, Accepted 07 Jan 2011, Published online: 14 Jun 2011

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (3)

Kaikai Guo, Guangli Guo, Huaizhan Li, Chenyang Wang & Yaqiang Gong. (2020) Strata movement and surface subsidence prediction model of deep backfilling mining. Energy Sources, Part A: Recovery, Utilization, and Environmental Effects 0:0, pages 1-15.
Read now
Yanlong Chen, Hideki Shimada, Takashi Sasaoka, Akihiro Hamanaka & Kikuo Matsui. (2013) Research on exploiting residual coal around final end-walls by highwall mining system in China. International Journal of Mining, Reclamation and Environment 27:3, pages 166-179.
Read now
Mustafa Kumral. (2012) Production planning of mines: Optimisation of block sequencing and destination. International Journal of Mining, Reclamation and Environment 26:2, pages 93-103.
Read now

Articles from other publishers (5)

Juyu Jiang, Ye Lu, Lanzhu Cao, Dong Wang, Laigui Wang, Xinping Han, Huiwen Yang & Zhengzhao Jia. (2022) The Calculation of Inelastic Zone Width of Coal Pillar in Highwall Mining With Backfill. Frontiers in Earth Science 10.
Crossref
Xingyin Ma, Zhiyong Fu, Yurong Li, Pengfei Zhang, Yongqiang Zhao & Guoping Ma. (2022) Study on Surface Subsidence Characteristics Based on Three-Dimensional Test Device for Simulating Rock Strata and Surface Movement. Energies 15:5, pages 1927.
Crossref
Lanyan Zeng, Shi Qiang Liu, Erhan Kozan, Paul Corry & Mahmoud Masoud. (2021) A comprehensive interdisciplinary review of mine supply chain management. Resources Policy 74, pages 102274.
Crossref
Ioannis E. Tsolas. (2021) Efficiency Analysis of Lignite Mining Operations Using Production Stochastic Frontier Modeling. Mining 1:1, pages 100-111.
Crossref
Rui Wang, Shuai Yan, Jianbiao Bai, Zhiguo Chang & Tianhao Zhao. (2019) Theoretical Analysis of Damaged Width & Instability Mechanism of Rib Pillar in Open-Pit Highwall Mining. Advances in Civil Engineering 2019, pages 1-15.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.