590
Views
30
CrossRef citations to date
0
Altmetric
Articles

Strategic mine planning model using network flow model and real case application

&
Pages 29-37 | Received 09 Jun 2011, Accepted 22 Jun 2011, Published online: 14 Sep 2011

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (9)

Abid Ali Khan Danish, Asif Khan & Khan Muhammad. (2023) A simulated annealing based stochastic long-term production scheduling of open-pit mines with stockpiling under grade uncertainty. International Journal of Mining, Reclamation and Environment 37:1, pages 43-65.
Read now
Ranajit Das, Erkan Topal & Elham Mardaneh. (2022) Improved optimised scheduling in stratified deposits in open pit mines – using in-pit dumping. International Journal of Mining, Reclamation and Environment 36:4, pages 287-304.
Read now
Renaud Senécal & Roussos Dimitrakopoulos. (2020) Long-term mine production scheduling with multiple processing destinations under mineral supply uncertainty, based on multi-neighbourhood Tabu search. International Journal of Mining, Reclamation and Environment 34:7, pages 459-475.
Read now
Snehamoy Chatterjee & Roussos Dimitrakopoulos. (2020) Production scheduling under uncertainty of an open-pit mine using Lagrangian relaxation and branch-and-cut algorithm. International Journal of Mining, Reclamation and Environment 34:5, pages 343-361.
Read now
Zhao Fu, Mohammad Waqar Ali Asad & Erkan Topal. (2019) A new model for open-pit production and waste-dump scheduling. Engineering Optimization 51:4, pages 718-732.
Read now
Shi Qiang Liu & Erhan Kozan. (2019) Integration of mathematical models for ore mining industry. International Journal of Systems Science: Operations & Logistics 6:1, pages 55-68.
Read now
Iain Farmer & Roussos Dimitrakopoulos. (2018) Schedule-based pushback design within the stochastic optimisation framework. International Journal of Mining, Reclamation and Environment 32:5, pages 327-340.
Read now
Erhan Kozan & Shi Qiang Liu. (2017) An operational-level multi-stage mine production timetabling model for optimally synchronising drilling, blasting and excavating operations. International Journal of Mining, Reclamation and Environment 31:7, pages 457-474.
Read now
Yu Li, Erkan Topal & Salih Ramazan. (2016) Optimising the long-term mine waste management and truck schedule in a large-scale open pit mine. Mining Technology 125:1, pages 35-46.
Read now

Articles from other publishers (21)

Yassine Yaakoubi & Roussos Dimitrakopoulos. (2023) Learning to schedule heuristics for the simultaneous stochastic optimization of mining complexes. Computers & Operations Research 159, pages 106349.
Crossref
Shi Qiang Liu, Erhan Kozan, Paul Corry, Mahmoud Masoud & Kai Luo. (2022) A real-world mine excavators timetabling methodology in open-pit mining. Optimization and Engineering 24:3, pages 1493-1535.
Crossref
Gokhan Turan & Ahmet Hakan Onur. (2022) Optimization of open-pit mine design and production planning with an improved floating cone algorithm. Optimization and Engineering 24:2, pages 1157-1181.
Crossref
Devendra Joshi, Marwan Ali Albahar, Premkumar Chithaluru, Aman Singh, Arvind Yadav & Yini Miro. (2022) A Novel Approach to Integrating Uncertainty into a Push Re-Label Network Flow Algorithm for Pit Optimization. Mathematics 10:24, pages 4803.
Crossref
Jorge Luiz Valença Mariz & Ali Soofastaei. 2022. Advanced Analytics in Mining Engineering. Advanced Analytics in Mining Engineering 205 306 .
Lanyan Zeng, Shi Qiang Liu, Erhan Kozan, Paul Corry & Mahmoud Masoud. (2021) A comprehensive interdisciplinary review of mine supply chain management. Resources Policy 74, pages 102274.
Crossref
Karo Fathollahzadeh, Elham Mardaneh, Mehmet Cigla & Mohammad Waqar Ali Asad. (2021) A mathematical model for open pit mine production scheduling with Grade Engineering® and stockpiling. International Journal of Mining Science and Technology 31:4, pages 717-728.
Crossref
Yue Xie, Aneta Neumann & Frank Neumann. (2021) Heuristic Strategies for Solving Complex Interacting Large-Scale Stockpile Blending Problems. Heuristic Strategies for Solving Complex Interacting Large-Scale Stockpile Blending Problems.
Babak Sohrabian, Saeed Soltani-Mohammadi, Ezzeddin Bakhtavar & Arash Taherinia. (2021) Joint simulation through orthogonal factors generated by the L-SHADE optimization method. Spatial Statistics 43, pages 100521.
Crossref
Abid Ali Khan Danish, Asif Khan, Khan Muhammad, Waqas Ahmad & Saad Salman. (2021) A simulated annealing based approach for open pit mine production scheduling with stockpiling option. Resources Policy 71, pages 102016.
Crossref
Claudio Vergara Valderrama, Ernesto Santibanez-González, Bruno Pimentel, Alfredo Candia-Véjar & Linda Canales-Bustos. (2020) Designing an environmental supply chain network in the mining industry to reduce carbon emissions. Journal of Cleaner Production 254, pages 119688.
Crossref
Mojtaba Rezakhah, Eduardo Moreno & Alexandra Newman. (2020) Practical performance of an open pit mine scheduling model considering blending and stockpiling. Computers & Operations Research 115, pages 104638.
Crossref
Mojtaba Rezakhah & Alexandra Newman. (2020) Open pit mine planning with degradation due to stockpiling. Computers & Operations Research 115, pages 104589.
Crossref
Ngoc Luan Mai, Erkan Topal, Oktay Erten & Bruce Sommerville. (2019) A new risk-based optimisation method for the iron ore production scheduling using stochastic integer programming. Resources Policy 62, pages 571-579.
Crossref
Zhibin Nie & Shuning Wang. (2019) A sequential simplex algorithm for the continuous convex piecewise linear network flow problem*. A sequential simplex algorithm for the continuous convex piecewise linear network flow problem*.
Shuai Xu, Fidelis T. Suorineni, Long An, Yuan Hui Li & Chang Yu Jin. (2019) Use of an artificial crown pillar in transition from open pit to underground mining. International Journal of Rock Mechanics and Mining Sciences 117, pages 118-131.
Crossref
Joao de Carvalho & Roussos Dimitrakopoulos. (2019) Effects of High-Order Simulations on the Simultaneous Stochastic Optimization of Mining Complexes. Minerals 9:4, pages 210.
Crossref
Burak Ozdemir & Mustafa Kumral. (2018) Appraising production targets through agent-based Petri net simulation of material handling systems in open pit mines. Simulation Modelling Practice and Theory 87, pages 138-154.
Crossref
Mustafa Kumral & Yuksel Asli Sari. (2017) Simulation-based mine extraction sequencing with chance constrained risk tolerance. SIMULATION 93:6, pages 527-539.
Crossref
Amina Lamghari. (2017) Mine Planning and Oil Field Development: A Survey and Research Potentials. Mathematical Geosciences 49:3, pages 395-437.
Crossref
Mohammad Mahdi Badiozamani & Hooman Askari-Nasab. (2014) Integration of reclamation and tailings management in oil sands surface mine planning. Environmental Modelling & Software 51, pages 45-58.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.