519
Views
21
CrossRef citations to date
0
Altmetric
Original Articles

Production scheduling under uncertainty of an open-pit mine using Lagrangian relaxation and branch-and-cut algorithm

ORCID Icon & ORCID Icon
Pages 343-361 | Received 06 Jun 2018, Accepted 10 Jun 2019, Published online: 01 Jul 2019

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (1)

Abid Ali Khan Danish, Asif Khan & Khan Muhammad. (2023) A simulated annealing based stochastic long-term production scheduling of open-pit mines with stockpiling under grade uncertainty. International Journal of Mining, Reclamation and Environment 37:1, pages 43-65.
Read now

Articles from other publishers (19)

Adhyan Vijeta Mittal, Animisha Sharanappa, Konish Bagchi, Senthil Prabu Ramalingam & Prabhakar Karthikeyan Shanmugam. (2023) Electric Vehicle Charging Scheduling using Branch and Cut Algorithm. Electric Vehicle Charging Scheduling using Branch and Cut Algorithm.
Xiaochuan Xu, Xiaowei Gu, Qing Wang, Yunqi Zhao, Wenyuan Kong, Zhenguo Zhu & Fengdan Wang. (2023) Enumeration optimization of open pit production scheduling based on mobile capacity search domain. Scientific Reports 13:1.
Crossref
Arman Hazrathosseini & Ali Moradi Afrapoli. (2023) The advent of digital twins in surface mining: Its time has finally arrived. Resources Policy 80, pages 103155.
Crossref
Kamyar Tolouei & Ehsan Moosavi. (2022) Optimization of the production scheduling problem in open-pit mines to maximize the net present value using the human mental search algorithm. Arabian Journal of Geosciences 16:1.
Crossref
Huanhuan Zhang, Zhenglei He, Yi Man, Jigeng Li, Mengna Hong & Kim Phuc Tran. 2023. Artificial Intelligence for Smart Manufacturing. Artificial Intelligence for Smart Manufacturing 97 117 .
Devendra Joshi, Marwan Ali Albahar, Premkumar Chithaluru, Aman Singh, Arvind Yadav & Yini Miro. (2022) A Novel Approach to Integrating Uncertainty into a Push Re-Label Network Flow Algorithm for Pit Optimization. Mathematics 10:24, pages 4803.
Crossref
Aparna Pramanik, Chiranjit Changdar, Abhinandan Khan, Snehamoy Chatterjee, Rajat Kumar Pal & Sudip Kumar Sahana. (2022) A 0–1 knapsack problem-based approach for solving open-pit mining problem with type-2 fuzzy parameters. Innovations in Systems and Software Engineering.
Crossref
Devendra Joshi, Premkumar Chithaluru, Aman Singh, Arvind Yadav, Dalia H. Elkamchouchi, Cristina Mazas Pérez-Oleaga & Divya Anand. (2022) A Novel Large-Scale Stochastic Pushback Design Merged with a Minimum Cut Algorithm for Open Pit Mine Production Scheduling. Systems 10:5, pages 159.
Crossref
Ali Can Ozdemir, Kurtuluş Buluş & Kasım Zor. (2022) Medium- to long-term nickel price forecasting using LSTM and GRU networks. Resources Policy 78, pages 102906.
Crossref
Parviz Sohrabi, Hesam Dehghani & Behshad Jodeiri Shokri. (2021) Determination of optimal production rate under price uncertainty—Sari Gunay gold mine, Iran. Mineral Economics 35:2, pages 187-201.
Crossref
Aref Alipour, Ali Asghar Khodaiari, Ahmad Jafari & Reza Tavakkoli-Moghaddam. (2022) An integrated approach to open-pit mines production scheduling. Resources Policy 75, pages 102459.
Crossref
Devendra Joshi, Amol Paithankar, Snehamoy Chatterjee & Sk Md Equeenuddin. (2022) Integrated Parametric Graph Closure and Branch-and-Cut Algorithm for Open Pit Mine Scheduling under Uncertainty. Mining 2:1, pages 32-51.
Crossref
Wen Ma, Zuyuan Huang, Ching-Hsien Hsu & Carlos Enrique Montenegro-Marin. (2022) Constraint Programming with Intelligent Backtracking using Artificial Intelligence. Arabian Journal for Science and Engineering.
Crossref
Yassine Yaakoubi & Roussos Dimitrakopoulos. (2022) A Data-Driven Approach for the Simultaneous Stochastic Optimization of Mining Complexes. IFAC-PapersOnLine 55:21, pages 67-72.
Crossref
Jorge Luiz Valença Mariz & Ali Soofastaei. 2022. Advanced Analytics in Mining Engineering. Advanced Analytics in Mining Engineering 205 306 .
Kamyar Tolouei, Ehsan Moosavi & Mehran Gholinejad. (2021) An effective MIP model based on grey wolf optimizer for lot-sizing LTPSOP in open-pit mines under uncertainty. Arabian Journal of Geosciences 14:17.
Crossref
Babak Sohrabian, Saeed Soltani-Mohammadi, Ezzeddin Bakhtavar & Arash Taherinia. (2021) Joint simulation through orthogonal factors generated by the L-SHADE optimization method. Spatial Statistics 43, pages 100521.
Crossref
Kamyar Tolouei & Ehsan Moosavi. (2020) Production scheduling problem and solver improvement via integration of the grey wolf optimizer into the augmented Lagrangian relaxation method. SN Applied Sciences 2:12.
Crossref
Kamyar Tolouei, Ehsan Moosavi, Amir Hossein Bangian Tabrizi, Peyman Afzal & Abbas Aghajani Bazzazi. (2020) Improving performance of open-pit mine production scheduling problem under grade uncertainty by hybrid algorithms混合算法改善品位不确定露天矿生产调度问题的性能. Journal of Central South University 27:9, pages 2479-2493.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.