Enrique Jelvez, Julian Ortiz, Nelson Morales Varela, Hooman Askari-Nasab & Gonzalo Nelis. (2023) A Multi-Stage Methodology for Long-Term Open-Pit Mine Production Planning under Ore Grade Uncertainty. Mathematics 11:18, pages 3907.
Crossref
Ranajit Das, Erkan Topal & Elham Mardaneh. (2023) A review of open pit mine and waste dump schedule planning. Resources Policy 85, pages 104064.
Crossref
Gonzalo Ares, César Castañón Fernández & Isidro Diego Álvarez. (2023) Ultimate Pit-Limit Optimization Algorithm Enhancement Using Structured Query Language. Minerals 13:7, pages 966.
Crossref
Guangwei Liu, Weiqiang Guo, Senlin Chai & Jiaming Li. (2023) Research on production capacity planning method of open-pit coal mine. Scientific Reports 13:1.
Crossref
Alejandra Vera-Burau, Daniel Álvarez-Ramírez, Lluís Sanmiquel & Marc Bascompta. (2023) A Comparison of the Fuel Consumption and Truck Models in Different Production Scenarios. Applied Sciences 13:9, pages 5769.
Crossref
Gonzalo Nelis, Nelson Morales & Enrique Jelvez. (2023) Optimal mining cut definition and short-term open pit production scheduling under geological uncertainty. Resources Policy 81, pages 103340.
Crossref
Guangwei Liu, Weiqiang Guo, Ensan Fu, Chuanda Yang & Jiaming Li. (2023) Dynamic optimization of open-pit coal mine production scheduling based on ARIMA and fuzzy structured element. Frontiers in Earth Science 10.
Crossref
Mohammad Tabesh, Ali Moradi Afrapoli & Hooman Askari-Nasab. (2023) A two-stage simultaneous optimization of NPV and throughput in production planning of open pit mines. Resources Policy 80, pages 103167.
Crossref
Arman Hazrathosseini & Ali Moradi Afrapoli. (2023) The advent of digital twins in surface mining: Its time has finally arrived. Resources Policy 80, pages 103155.
Crossref
Pierre Nancel-Penard, Nelson Morales & Fabien Cornillier. (2022) A recursive time aggregation-disaggregation heuristic for the multidimensional and multiperiod precedence-constrained knapsack problem: An application to the open-pit mine block sequencing problem. European Journal of Operational Research 303:3, pages 1088-1099.
Crossref
Shi Qiang Liu, Zhaoyun Lin, Debiao Li, Xiangong Li, Erhan Kozan & Mahmoud Masoud. (2022) Recent Research Agendas in Mining Equipment Management: A Review. Mining 2:4, pages 769-790.
Crossref
Adrian Ball, Katherine L. Silversides, Anna Chlingaryan & Arman Melkumyan. (2022) Creating large scale probabilistic boundaries using Gaussian Processes. Expert Systems with Applications 199, pages 116959.
Crossref
Parviz Sohrabi, Hesam Dehghani & Behshad Jodeiri Shokri. (2021) Determination of optimal production rate under price uncertainty—Sari Gunay gold mine, Iran. Mineral Economics 35:2, pages 187-201.
Crossref
Margaret Armstrong, Juan Valencia, Guido Lagos & Xavier Emery. (2021) Constructing Branching Trees of Geostatistical Simulations. Mathematical Geosciences 54:4, pages 711-743.
Crossref
Devendra Joshi, Amol Paithankar, Snehamoy Chatterjee & Sk Md Equeenuddin. (2022) Integrated Parametric Graph Closure and Branch-and-Cut Algorithm for Open Pit Mine Scheduling under Uncertainty. Mining 2:1, pages 32-51.
Crossref
Exequiel Sepúlveda, Peter Dowd & Chaoshui Xu. (2021) A Novel Index for Quantifying Small-Scale Resource Heterogeneity. Mathematical Geosciences 54:1, pages 243-282.
Crossref
Mostafa Mohamed Ali Elbeblawi, Hassan Ali Abdelhak Elsaghier, Mostafa Tantawy Mohamed Amin & Wael Rashad Elrawy AbdellahMostafa Mohamed Ali Elbeblawi, Hassan Ali Abdelhak Elsaghier, Mostafa Tantawy Mohamed Amin & Wael Rashad Elrawy Abdellah. 2022. Surface Mining Technology. Surface Mining Technology
25
56
.
Jorge Luiz Valença Mariz & Ali Soofastaei. 2022. Advanced Analytics in Mining Engineering. Advanced Analytics in Mining Engineering
205
306
.
Ali Moradi-Afrapoli & Hooman Askari-Nasab. 2022. Advanced Analytics in Mining Engineering. Advanced Analytics in Mining Engineering
181
203
.
Firdevs Kübra Altuntov & Mustafa Erkayaoğlu. (2021) A New Approach to Optimize Ultimate Geometry of Open Pit Mines with Variable Overall Slope Angles. Natural Resources Research 30:6, pages 4047-4062.
Crossref
Soroush Khazaei & Yashar Pourrahimian. (2021) Mathematical Programming Application in Sublevel Caving Production Scheduling. Mining 1:2, pages 180-191.
Crossref
Margaret Armstrong, Tomas Lagos, Xavier Emery, Tito Homem-de-Mello, Guido Lagos & Denis Sauré. (2021) Adaptive open-pit mining planning under geological uncertainty. Resources Policy 72, pages 102086.
Crossref
Karo Fathollahzadeh, Elham Mardaneh, Mehmet Cigla & Mohammad Waqar Ali Asad. (2021) A mathematical model for open pit mine production scheduling with Grade Engineering® and stockpiling. International Journal of Mining Science and Technology 31:4, pages 717-728.
Crossref
Yue Xie, Aneta Neumann & Frank Neumann. (2021) Heuristic Strategies for Solving Complex Interacting Large-Scale Stockpile Blending Problems. Heuristic Strategies for Solving Complex Interacting Large-Scale Stockpile Blending Problems.
Yue Xie, Aneta Neumann & Frank Neumann. (2021) Heuristic strategies for solving complex interacting stockpile blending problem with chance constraints. Heuristic strategies for solving complex interacting stockpile blending problem with chance constraints.
Nasser Madani, Mohammad Maleki & Fatemeh Sepidbar. (2021) Integration of Dual Border Effects in Resource Estimation: A Cokriging Practice on a Copper Porphyry Deposit. Minerals 11:7, pages 660.
Crossref
Abid Ali Khan Danish, Asif Khan, Khan Muhammad, Waqas Ahmad & Saad Salman. (2021) A simulated annealing based approach for open pit mine production scheduling with stockpiling option. Resources Policy 71, pages 102016.
Crossref
Ahlam Maremi, Eugene Ben-Awuah & Hooman Askari-Nasab. (2021) Multi-objective Mathematical Programming Framework for Integrated Oil Sands Mine Planning and Tailings Disposal Optimization. Mining, Metallurgy & Exploration 38:3, pages 1355-1374.
Crossref
Alexey Tyurin & Akhmetgalym Tlek Akhmetgalymuly. (2021) Planning of coal production taking into account the intensity of shipment and the capacity of transport routes. E3S Web of Conferences 315, pages 03018.
Crossref
Ali Soltani Khaboushan, Morteza Osanloo & Akbar Esfahanipour. (2020) Optimization of open pit to underground transition depth: An idea for reducing waste rock contamination while maximizing economic benefits. Journal of Cleaner Production 277, pages 123530.
Crossref
S. K. Sinha & B. S. Choudhary. (2020) Pit Optimization for Improved NPV and Life of Mine in Heterogeneous Iron Ore Deposit. Journal of The Institution of Engineers (India): Series D 101:2, pages 253-264.
Crossref
Farzad Sotoudeh, Micah Nehring, Mehmet Kizil, Peter Knights & Amin Mousavi. (2020) Production scheduling optimisation for sublevel stoping mines using mathematical programming: A review of literature and future directions. Resources Policy 68, pages 101809.
Crossref
Seyyed-Omid Gilani, Javad Sattarvand, Mohsen Hajihassani & Shahrum Shah Abdullah. (2020) A stochastic particle swarm based model for long term production planning of open pit mines considering the geological uncertainty. Resources Policy 68, pages 101738.
Crossref
A.Soltani Khaboushan & M. Osanloo. (2020) Semi-symmetrical production scheduling of an orebody for optimizing the depth of transitioning from open pit to block caving. Resources Policy 68, pages 101700.
Crossref
Michael Wessel, Reinhard Madlener & Christoph Hilgers. (2020) Economic Feasibility of Semi-Underground Pumped Storage Hydropower Plants in Open-Pit Mines. Energies 13:16, pages 4178.
Crossref
Mohammad Maleki, Enrique Jélvez, Xavier Emery & Nelson Morales. (2020) Stochastic Open-Pit Mine Production Scheduling: A Case Study of an Iron Deposit. Minerals 10:7, pages 585.
Crossref
Marcélio Prado Fontes & Rodrigo de Lemos Peroni. (2020) Influence of water level in mine sequencing applied to strategic mining planning. REM - International Engineering Journal 73:2, pages 233-240.
Crossref
Adrien Rimélé, Roussos Dimitrakopoulos & Michel Gamache. (2020) A dynamic stochastic programming approach for open-pit mine planning with geological and commodity price uncertainty. Resources Policy 65, pages 101570.
Crossref
Mojtaba Rezakhah, Eduardo Moreno & Alexandra Newman. (2020) Practical performance of an open pit mine scheduling model considering blending and stockpiling. Computers & Operations Research 115, pages 104638.
Crossref
Alexey Tyurin & Ildar Kuvataev. (2020) Improving the Efficiency of a Mining Enterprise by Coordinating Production Processes. E3S Web of Conferences 174, pages 01059.
Crossref
Enrique Jélvez, Nelson Morales & Julián M. Ortíz. 2020. Proceedings of the 28th International Symposium on Mine Planning and Equipment Selection - MPES 2019. Proceedings of the 28th International Symposium on Mine Planning and Equipment Selection - MPES 2019
83
91
.
J. Githiria. 2020. Proceedings of the 28th International Symposium on Mine Planning and Equipment Selection - MPES 2019. Proceedings of the 28th International Symposium on Mine Planning and Equipment Selection - MPES 2019
92
102
.
Meisam Saleki, Reza Kakaie & Mohammad Ataei. (2019) Mathematical relationship between ultimate pit limits generated by discounted and undiscounted block value maximization in open pit mining. Journal of Sustainable Mining 18:2, pages 94-99.
Crossref
Jian Zhang, Barrie R. Nault & Roussos G. Dimitrakopoulos. (2019) Optimizing a mineral value chain with market uncertainty using benders decomposition. European Journal of Operational Research 274:1, pages 227-239.
Crossref
Barry KingAlexandra Newman. (2018) Optimizing the Cutoff Grade for an Operational Underground Mine. Interfaces 48:4, pages 357-371.
Crossref
Vidal Félix Navarro Torres, Beck Nader, Carlos Enrique Arroyo Ortiz, Felipe Ribeiro Souza, Hudson Rodrigues Burgarelli, Leonardo Soares Chaves, Luiz Alberto Carvalho, Taís Renata Câmara, Eunírio Zanetti & Roberto Galery. (2018) Classical and stochastic mine planning techniques, state of the art and trends. REM - International Engineering Journal 71:2, pages 289-297.
Crossref
Chul Hun Choi, Joonyup Eun, Jinjian Cao, Seokcheon Lee & Fu Zhao. (2018) Global strategic level supply planning of materials critical to clean energy technologies – A case study on indium. Energy 147, pages 950-964.
Crossref
Gonzalo Muñoz, Daniel Espinoza, Marcos Goycoolea, Eduardo Moreno, Maurice Queyranne & Orlando Rivera Letelier. (2017) A study of the Bienstock–Zuckerberg algorithm: applications in mining and resource constrained project scheduling. Computational Optimization and Applications 69:2, pages 501-534.
Crossref
Mohammad Reza Ahmadi. (2018) Cutoff grade optimization based on maximizing net present value using a computer model. Journal of Sustainable Mining 17:2, pages 68-75.
Crossref
Amir Bijan Yasrebi, Ardeshir Hezarkhani & Peyman Afzal. (2017) Application of Present Value-Volume (PV-V) and NPV-Cumulative Total Ore (NPV-CTO) fractal modelling for mining strategy selection. Resources Policy 53, pages 384-393.
Crossref
Morteza Osanloo & Mehdi Rahmanpour. (2017) Optimizing short-term production plan using a portfolio optimization model. REM - International Engineering Journal 70:1, pages 109-116.
Crossref
Barry King, Marcos Goycoolea & A. Newman. (2017) Optimizing the open pit-to-underground mining transition. European Journal of Operational Research 257:1, pages 297-309.
Crossref
Michelle L. Blom, Adrian R. Pearce & Peter J. Stuckey. (2016) A Decomposition-Based Algorithm for the Scheduling of Open-Pit Networks Over Multiple Time Periods. Management Science 62:10, pages 3059-3084.
Crossref
Amina Lamghari & Roussos Dimitrakopoulos. (2016) Network-flow based algorithms for scheduling production in multi-processor open-pit mines accounting for metal uncertainty. European Journal of Operational Research 250:1, pages 273-290.
Crossref
Enrique Jélvez, Nelson Morales, Pierre Nancel-Penard, Juan Peypouquet & Patricio Reyes. (2016) Aggregation heuristic for the open-pit block scheduling problem. European Journal of Operational Research 249:3, pages 1169-1177.
Crossref
Seyed-Omid Gilani & Javad Sattarvand. (2016) Integrating geological uncertainty in long-term open pit mine production planning by ant colony optimization. Computers & Geosciences 87, pages 31-40.
Crossref
E. Moosavi & J. Gholamnejad. (2016) Long-term production scheduling modeling for the open pit mines considering tonnage uncertainty via indicator kriging. Journal of Mining Science 51:6, pages 1226-1234.
Crossref
Michelle L. Blom, Christina N. Burt, Adrian R. Pearce & Peter J. Stuckey. (2014) A Decomposition-Based Heuristic for Collaborative Scheduling in a Network of Open-Pit Mines. INFORMS Journal on Computing 26:4, pages 658-676.
Crossref
Behrang Koushavand, Hooman Askari-Nasab & Clayton V. Deutsch. (2014) A linear programming model for long-term mine planning in the presence of grade uncertainty and a stockpile. International Journal of Mining Science and Technology 24:4, pages 451-459.
Crossref
Maksud Ibrahimov, Arvind Mohais, Sven Schellenberg & Zbigniew Michalewicz. (2014) Scheduling in iron ore open-pit mining. The International Journal of Advanced Manufacturing Technology 72:5-8, pages 1021-1037.
Crossref
W. Brian Lambert, Andrea Brickey, Alexandra M. Newman & Kelly Eurek. (2014) Open-Pit Block-Sequencing Formulations: A Tutorial. Interfaces 44:2, pages 127-142.
Crossref
Rahmanpour Mahdi & Osanloo Morteza. 2014. Mine Planning and Equipment Selection. Mine Planning and Equipment Selection
197
207
.
Daniel Espinoza, Marcos Goycoolea, Eduardo Moreno & Alexandra Newman. (2012) MineLib: a library of open pit mining problems. Annals of Operations Research 206:1, pages 93-114.
Crossref
Yousuf Azimi, Morteza Osanloo & Akbar Esfahanipour. (2013) An uncertainty based multi-criteria ranking system for open pit mining cut-off grade strategy selection. Resources Policy 38:2, pages 212-223.
Crossref
Renaud Chicoisne, Daniel Espinoza, Marcos Goycoolea, Eduardo Moreno & Enrique Rubio. (2012) A New Algorithm for the Open-Pit Mine Production Scheduling Problem. Operations Research 60:3, pages 517-528.
Crossref
Andreas Bley, Ambros M. Gleixner, Thorsten Koch & Stefan Vigerske. 2012. Modeling, Simulation and Optimization of Complex Processes. Modeling, Simulation and Optimization of Complex Processes
25
39
.
Michael A. Martinez & Alexandra M. Newman. (2011) A solution approach for optimizing long- and short-term production scheduling at LKAB’s Kiruna mine. European Journal of Operational Research 211:1, pages 184-197.
Crossref
Yuzo TAMANISHI, Shinsuke MURAKAMI & Jiro YAMATOMI. (2011) Algorithm Development of Production Scheduling for Open Pit Operations Using 4-D Network Relaxation. Journal of MMIJ 127:10_11, pages 615-621.
Crossref
Alexandra M. Newman, Enrique Rubio, Rodrigo Caro, Andrés Weintraub & Kelly Eurek. (2010) A Review of Operations Research in Mine Planning. Interfaces 40:3, pages 222-245.
Crossref
Ranajit Das, Erkan Topal & Elham Mardaneh. (2022) A Review of Open Pit Mine Waste Dump Management Planning. SSRN Electronic Journal.
Crossref
Ranajit Das, Erkan Topal & Elham Mardaneh. (2022) A Review of Open Pit Mine Waste Dump Management Planning. SSRN Electronic Journal.
Crossref