1,416
Views
12
CrossRef citations to date
0
Altmetric
Research Article

A periodic review integrated inventory model for buyer’s unidentified protection interval demand distribution

, , & | (Reviewing Editor)
Article: 1206689 | Received 21 Oct 2015, Accepted 18 Jun 2016, Published online: 14 Jul 2016

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (3)

Wakhid Ahmad Jauhari, Selvia Mayangsari, Nughthoh Arfawi Kurdhi & Kuan Yew Wong. (2017) A fuzzy periodic review integrated inventory model involving stochastic demand, imperfect production process and inspection errors. Cogent Engineering 4:1.
Read now
Wakhid Ahmad Jauhari & Rendy Surya Saga. (2017) A stochastic periodic review inventory model for vendor–buyer system with setup cost reduction and service–level constraint. Production & Manufacturing Research 5:1, pages 371-389.
Read now

Articles from other publishers (9)

Haider Ali, Reshma Nasreen, Neetu Arneja & Chandra K. Jaggi. (2022) Optimization of a periodically assessing model with manageable lead time under SLC with back order rebate for deteriorating items. International Journal of System Assurance Engineering and Management 14:1, pages 241-266.
Crossref
Abu Hashan Md Mashud, Dipa Roy, Ripon K. Chakrabortty, Ming-Lang Tseng & Magfura Pervin. (2022) An optimum balance among the reduction in ordering cost, product deterioration and carbon emissions: a sustainable green warehouse. Environmental Science and Pollution Research 29:51, pages 78029-78051.
Crossref
Wakhid Ahmad Jauhari, I Nyoman Pujawan, Mokh Suef & Kannan Govindan. (2022) Low carbon inventory model for vendor‒buyer system with hybrid production and adjustable production rate under stochastic demand. Applied Mathematical Modelling 108, pages 840-868.
Crossref
Tannaz Khaleghi, Alper Murat & Suzan Arslanturk. (2021) A tree based approach for multi-class classification of surgical procedures using structured and unstructured data. BMC Medical Informatics and Decision Making 21:1.
Crossref
Agnieszka A. Tubis, Jacek Ryczyński & Arkadiusz Żurek. (2021) Risk Assessment for the Use of Drones in Warehouse Operations in the First Phase of Introducing the Service to the Market. Sensors 21:20, pages 6713.
Crossref
Jacek Ryczyński & Agnieszka A. Tubis. (2021) Tactical Risk Assessment Method for Resilient Fuel Supply Chains for a Military Peacekeeping Operation. Energies 14:15, pages 4679.
Crossref
Hesamoddin Tahami, Abolfazl Mirzazadeh & Aref Gholami-Qadikolaei. (2019) Simultaneous control on lead time elements and ordering cost for an inflationary inventory-production model with mixture of normal distributions LTD under finite capacity. RAIRO - Operations Research 53:4, pages 1357-1384.
Crossref
I.D Melinda, W.A Jauhari & C.N Rosyidi. (2019) An eletricity inventory model for power plant and transmission stasion system with in-house demand and carbon emission cost. IOP Conference Series: Materials Science and Engineering 495, pages 012008.
Crossref
N A Kurdhi, A Jamaluddin, W A Jauhari & D R S Saputro. (2017) A periodic review integrated inventory model with controllable safety stock and setup cost under service level constraint and distribution-free demand. Journal of Physics: Conference Series 855, pages 012022.
Crossref