113
Views
13
CrossRef citations to date
0
Altmetric
Original Articles

A Study of Resource Planning for Precast Production

Pages 106-114 | Received 20 Jul 2006, Accepted 20 Nov 2006, Published online: 09 Jun 2011

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (1)

Zhaojing Wang & Hao Hu. (2018) Dynamic response to demand variability for precast production rescheduling with multiple lines. International Journal of Production Research 56:16, pages 5386-5401.
Read now

Articles from other publishers (12)

Achini Peiris, Felix Kin Peng Hui, Colin Duffield & Tuan Ngo. (2023) Production scheduling in modular construction: Metaheuristics and future directions. Automation in Construction 150, pages 104851.
Crossref
Minhao Ruan & Feng Xu. (2022) IMPROVED EIGHT-PROCESS MODEL OF PRECAST COMPONENT PRODUCTION SCHEDULING CONSIDERING RESOURCE CONSTRAINTS. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT 28:3, pages 208-222.
Crossref
Zhansheng Liu, Zisheng Liu, Meng Liu & Jingjing Wang. (2021) Optimization of Flow Shop Scheduling in Precast Concrete Component Production via Mixed-Integer Linear Programming. Advances in Civil Engineering 2021, pages 1-14.
Crossref
Zhaojing WangHao HuJie Gong. (2018) Modeling Worker Competence to Advance Precast Production Scheduling Optimization. Journal of Construction Engineering and Management 144:11.
Crossref
Mehrdad Arashpour, Vineet Kamat, Yu Bai, Ron Wakefield & Babak Abbasi. (2018) Optimization modeling of multi-skilled resources in prefabrication: Theorizing cost analysis of process integration in off-site construction. Automation in Construction 95, pages 1-9.
Crossref
Zhaojing Wang, Hao Hu, Jie Gong & Xiaoping Ma. (2018) Synchronizing production scheduling with resources allocation for precast components in a multi-agent system environment. Journal of Manufacturing Systems 49, pages 131-142.
Crossref
Liulin Kong, Heng Li, Hanbin Luo, Lieyun Ding & Xiaoling Zhang. (2018) Sustainable performance of just-in-time (JIT) management in time-dependent batch delivery scheduling of precast construction. Journal of Cleaner Production 193, pages 684-701.
Crossref
Zhaojing Wang, Hao Hu & Jie Gong. (2018) Framework for modeling operational uncertainty to optimize offsite production scheduling of precast components. Automation in Construction 86, pages 69-80.
Crossref
Mehrdad Arashpour, Ron Wakefield, Babak Abbasi, E.W.M. Lee & James Minas. (2016) Off-site construction optimization: Sequencing multiple job classes with time constraints. Automation in Construction 71, pages 262-270.
Crossref
Na-Rae Shin, Young-Suk Kim, Seung-Woo Han & Dong-Jun Yeom. (2016) Development of a Decision Support System for Production Scheduling of Precast Concrete Members. Journal of the Architectural Institute of Korea Structure & Construction 32:2, pages 31-40.
Crossref
A. KhaliliD. K. Chua. (2014) Integrated Prefabrication Configuration and Component Grouping for Resource Optimization of Precast Production. Journal of Construction Engineering and Management 140:2.
Crossref
J-M Yang & Y K Park. (2009) Scheduling of casting in real foundries using linear programming. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 223:10, pages 1351-1360.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.