Abstract
This paper addresses the problem of multiple manufacturing modes integrated into the cutting stock problem, based on a real-life application of the concrete pole manufacturing. The main aim is to propose, formulate and test this integrated problem, which can be applied to the construction industry and other contexts of multiple manufacturing modes with cutting processes. The motivation for this proposal is the construction industry, in which reinforced concrete structures can be reinforced by various combinations of one-dimensional steel bars of varying thicknesses and lengths. An integer programming mathematical formulation is proposed aiming to minimise the total cost and to meet a demand of final products with different possible configurations. A column generation procedure is used as the solution method together with a heuristic procedure to find an integer solution. Computational results were performed with practical instances in order to assess the value of the approach and with a set of random generated instances in order to explore the influence of parameters on the results. Some managerial insights are presented.
Acknowledgments
The authors would like to thank the editor and anonymous reviewers for their careful reading and useful comments.
Disclosure statement
No potential conflict of interest was reported by the author(s).
ORCID
Felipe Kesrouani Lemos http://orcid.org/0000-0002-0488-7839
Adriana Cristina Cherri http://orcid.org/0000-0003-1934-4682
Silvio Alexandre de Araujo http://orcid.org/0000-0002-4762-2048