279
Views
2
CrossRef citations to date
0
Altmetric
Original Articles

Numerical investigation of dual-row batter pile wall in deep excavation

, , , &
Pages 5793-5807 | Received 19 Jul 2021, Accepted 03 Aug 2021, Published online: 24 Aug 2021
 

Abstract

To evaluate the performance of dual-row batter pile wall (DRBPW) in deep excavations, a three-dimensional numerical model was established. The plastic hardening (PH) constitutive model in FLAC3D was adopted, considering the hardening property of the soil. A series of parametric study was conducted to investigate the effect of different factors. By analyzing the maximum lateral displacement, the pile shaft deflection and bending moment of both the leading and trailing row, the effect of inclination angle, pile diameter, penetration depth, and row spacing on the behavior of DRBPW was determined. The following conclusions could be drawn: (1) The bearing capacity of DRBPW is quite larger than that of the dual-row vertical pile wall (DRVPW). With the increase of inclination angle, a substantial reduction of lateral displacement could be observed. However, the beneficial role of batter pile is almost negligible when the inclination angle is not larger than 5°. The recommended inclination degree of the batter pile is 10° to 15°. (2) The maximum displacement of the leading and trailing rows lies at a distance below the pile cap, while the maximum bending moment is located at a small distance below the dredging line. The maximum bending moment of the leading pile is approximately twice that of the trailing one, thereby indicating that the leading pile bear more lateral earth pressure than the trailing pile. (3) The pile diameter, penetration depth and row spacing should be maintained in a suitable range; otherwise, the DRBPW may fail earlier than expected. The slender ratios is recommend to be set not larger than 30. The penetration ratio should not be less than 0.22. The optimal row spacing for the DRBPW is four times the diameter.

Additional information

Funding

This work was supported by Xiamen Xiang'an Airport Investment and Construction Co., Ltd. The authors would also disclose receipt of the financial support for the research, authorship, and/or publication of this article from Key Laboratory of Transport Infrastructure Health and Safety of Xiamen. The publication of this article was also supported by Fujian Natural Science Foundation Project (2019J01272, 2020J05238) and Xiamen Science and Technology Planning Project (3502Z20193062). Jinbi Ye contributed equally to this work and should be considered as co-first authors.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 423.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.