160
Views
5
CrossRef citations to date
0
Altmetric
General Paper

Highway improvement project selection by the joint consideration of cost-benefit and risk criteria

, , &
Pages 313-325 | Received 01 Dec 2011, Accepted 01 Mar 2012, Published online: 21 Dec 2017
 

Abstract

Since highway improvement project selection requires screening thousands of road segments with respect to crashes for further analysis and final project selection, we provide a two-step project selection methodology and describe an application case to demonstrate its advantages. In the first step of the proposed methodology, we will use odds against observing a given crash count, injury count, run-off road count and so on as measures of risk and a multi-criteria pre-selection technique with the objective to decrease the number of prospective improvement locations. In the second step, the final project selection is accomplished based on a composite efficiency measure of estimated cost, benefit and hazard assessment (odds) under budget constraints. To demonstrate the two-step methodology, we will analyze 4 years of accident data at 23 000 locations where the final projects are selected out of several hundred of potential locations.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 277.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.