Minimizing total completion time on a single machine with step improving jobs

&
Pages 1481-1490 | Received 07 Aug 2013, Accepted 08 Sep 2014, Published online: 21 Dec 2017

Figures & data

Figure 1 The structure of schedule σ.

Figure 1 The structure of schedule σ.

Figure 2 Two possible structures of schedule σ.

Figure 2 Two possible structures of schedule σ.

Table 1 Performance of the heuristic with different numbers of jobs and different common critical dates

Table 2 Performance of the heuristic with different processing times

Table 3 Performance of the heuristic algorithm compared with optimal solutions