218
Views
27
CrossRef citations to date
0
Altmetric
Original Articles

Scheduling with product family set-up times: an application in TFT LCD manufacturing

Pages 4235-4248 | Received 01 Mar 2003, Published online: 21 Feb 2007
 

Abstract

The development of a scheduling methodology for module processing in thin film transistor liquid crystal display manufacturing is presented. The problem is a parallel machine-scheduling problem with family set-up times and due dates. Two objectives are considered: total tardiness and the number of family set-ups. Two heuristics are developed based on the MULTIFIT method and tabu search. The experimental results show that the proposed algorithms give schedules that are very efficient in terms of both total tardiness and the number of family set-ups.

Acknowledgement

This work was supported by the Post-doctoral Fellowship program of Korea Science & Engineering Foundation (KOSEF).

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 973.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.