221
Views
5
CrossRef citations to date
0
Altmetric
Original Articles

Transient inter-production scheduling based on Petri nets and constraint programming

, , , &
Pages 6591-6608 | Received 24 Aug 2010, Published online: 15 Feb 2011
 

Abstract

In this article, we focus on the transient inter-production scheduling problem between two cyclic productions in the framework of flexible manufacturing systems. This problem is first formulated as a reachability problem in timed Petri nets (TPN), then solved using a methodology based on constraint programming. Our work is based on the controlled executions proposed by Chretienne to model the sequence of transition firing dates. Our methodology is based on a preliminary resolution of the state equation between initial and final states in the underlying non-TPN. Then, we choose a duration T max corresponding to the maximal duration time of the scheduling. For each solution S of the state equation, we build a controlled execution from the sequence of firings in S. After the propagation of firing date constraints and reachability constraints in the TPN, we use constraint programming to enumerate the set of feasible controlled executions.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 973.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.