Flexible job-shop scheduling problems with ‘AND’/‘OR’ precedence constraints

, , &
Pages 1979-2001 | Received 27 Feb 2010, Accepted 24 Jan 2011, Published online: 30 Aug 2011
 

Abstract

The purpose of this research is to solve flexible job-shop scheduling problems with ‘AND’/‘OR’ precedence constraints in the operations. We first formulate the problem as a Mixed-Integer Linear Program (MILP). The MILP can be used to compute optimal solutions for small-sized problems. We also developed a heuristic algorithm that can obtain a good solution for the problem regardless of its size. Moreover, we have developed a representation and schedule builder that always produces a legal and feasible solution for the problem, and developed genetic and tabu search algorithms based on the proposed schedule builder. The results of the computational experiments show that the developed meta-heuristics are very effective.

Acknowledgements

The authors are grateful to the careful and constructive reviews from three anonymous referees. This work was supported by the Grant of the Korean Ministry of Education, Science and Technology (The Regional Core Research Program/Institute of Logistics Information Technology).

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 973.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.