Figures & data
Table 1. The applied notation.
Table 2. Benchmark of robust production planning methods.
Figure 4. Total lateness (left) and cost (right) results of the benchmark with the five different planning methods.
![Figure 4. Total lateness (left) and cost (right) results of the benchmark with the five different planning methods.](/cms/asset/bf50998d-4025-4f15-85a2-a1d22782415f/tprs_a_1198506_f0004_oc.gif)
Table 3. Module parameters in the test case.
Table 4. Simulation analysis: execution of the production plans (pre-inventory processes).