974
Views
21
CrossRef citations to date
0
Altmetric
Original Articles

A combined supply chain optimisation model for the installation phase of offshore wind projects

, , &
Pages 1189-1207 | Received 13 Mar 2017, Accepted 03 Nov 2017, Published online: 20 Nov 2017
 

Abstract

This paper proposes a combined model for port selection and supply chain optimisation for the installation phase of an offshore wind farm. Two strategic models are proposed where the first model, based on Analytical Hierarchy Process (AHP), aims to select the most suitable installation port. The second model is developed using Integer Linear Programming (ILP) in order to determine the optimal transportation schedule of the components from suppliers to the chosen installation port. The proposed models are evaluated for the West Gabbard (UK) offshore wind farm located in southern part of the North Sea. According to the computational results, the AHP model chooses port of Oostende, Belgium as the most suitable installation port for this offshore wind farm whereas the proposed supply chain model shows that the total transportation cost makes up 9% of total supply chain cost.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 973.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.