Abstract

The industrial sector consumes half of the world delivered energy and is responsible for a third of carbon dioxide emissions which cause severe environmental pollution. The industry has to change its behaviour concerning the energy consumption. Since two-machine flow shop scheduling (F2|perm|Cmax) is one of the typical problems of the manufacturing industry, this paper aims to build an energy-cost-aware scheduling plan. This work tackles the joint optimisation of makespan and electricity cost in two-machine flow shop scheduling problem under electricity pricing. We enhance the financial aspect of the optimal solution of F2|perm|Cmax by minimising the electricity cost without increasing the makespan. Firstly, we show the contribution of the generation of several optimal equivalent solutions of F2|perm|Cmax. The optimal equivalent solutions have different electricity costs but present the same makespan. Then, we determine the optimal starting time of jobs on several equivalent optimal solutions to get the best production plan. Finally, the numerical tests show that our proposed approach improves the electricity cost significantly under optimal makespan. The results provide good solutions to managers and decision makers to achieve energy cost savings without sacrificing the productivity which can contribute to sustainable development of the manufacturing industry.

Disclosure statement

No potential conflict of interest was reported by the authors.

Additional information

Funding

This work is co-funded by the French Ministère de l'Enseignement Supérieur, de la Recherche Scientifique et des Technologies de l'Information et de la Communication (Ministry of Higher Education, Research and Innovation of France) and European Regional Development Fund (European FEDER), started on October 2017.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 973.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.