Abstract
This paper presents a hybrid variable neighbourhood search/tabu search (HVNTS) method and a neighbourhood generation strategy called pairwise inter-reshuffle (PIR) for process planning of 5-axis electrical discharge machining (EDM) drilling processes, which aims to minimize the total non-productive time of the machining process, including tool travelling time, tool switching time and Z-axis compensation moving time. To obtain a mathematical model of the non-productive time, a kinematic transformation and a Chebyshev distance function are then utilized. To solve the mathematical model efficiently, an HVNTS algorithm is applied as the model has a large number of 0–1variables. To improve the solution quality, the PIR method and a dynamic neighbourhood strategy are applied simultaneously and verified. The obtained simulation results demonstrate that the proposed basic and the improved HVNTS have a significant contribution in optimizing the non-productive time of the 5-axis EDM drilling process effectively.
Acknowledgments
This research is financially supported by the National Natural Science Foundation of China (No. 51775341, 51675340), National Science and Technology Major Project of China (No. 2018ZX04005001), Shenzhen Basic Research Program (No. JCYJ20170811160440239).
Disclosure statement
No potential conflict of interest was reported by the author(s).