Figures & data
Table 1. Examples of articles studying common planning problems from the sawing industry.
Table 2. Articles gathered during the literature review using metaheuristics.
Table 3. Articles implementing specific optimisation methods to deal with uncertainty in the planning process.
Table 4. List of articles collected during the literature review using multi-agent simulation technologies.
Haberl, J., C. Nowak, H. Stettner, G. Stoiser, and H. Woschitz. 1991. “A Branch-and-Bound Algorithm for Solving a Fixed Charge Problem in the Profit Optimization of Sawn Timber Production.” Zeitschrift für Operations Research 35 (2): 151–166. Maness, T. C., and D. M. Adams. 1991. “The Combined Optimization of Log Bucking and Sawing Strategies.” Wood and Fiber Science 23 (2): 296–314. Reinders, M. 1992. “Cutting Stock Optimization and Integral Production Planning for Centralized Wood Processing.” Mathematical and Computer Modelling 16 (1): 37–55. Sinclair, M., and S. Erasmus. 1992. “A Microcomputer-Based Decision Support System for the Management of Lumber Mill Production.” Computers & Industrial Engineering 22 (4): 435–446. Reinders, M. 1993. “Tactical Planning for a Cutting Stock System.” Journal of the Operational Research Society 44 (7): 645–657. Todoraki, C., and M. Ronnqvist. 2001. “Log Sawing Optimisation Directed by Market Demand.” New Zealand Journal of Forestry 45: 29–33. Donald, W. S., T. C. Maness, and M. V. Marinescu. 2001. “Production Planning for Integrated Primary and Secondary Lumber Manufacturing.” Wood and Fiber Science 33 (3): 334–344. Maness, T. C., and S. E. Norton. 2002. “Multiple Period Combined Optimization Approach to Forest Production Planning.” Scandinavian Journal of Forest Research 17 (5): 460–471. Corro, H., M. Singer, and P. Donoso. 2007. “Internal Supply Chain Management in the Chilean Sawmill Industry.” International Journal of Operations & Production Management 27: 524–541. Caballero, R., T. Gomez, J. Molina, O. Fosado, M. A. Leon, M. Garofal, and B. Saavedra. 2009. “Sawing Planning Using a Multicriteria Approach.” Journal of Industrial & Management Optimization 5 (2): 303. Pradenas, L., C. Alvarez, and J. Ferland. 2009. “A Solution for the Aggregate Production Planning Problem in a Multi-plant, Multi-period and Multi-product Environment.” Acta Mathematica Vietnamica 34 (1): 11–17. Zanjani, M. K., D. Ait-Kadi, and M. Nourelfath. 2010. “Robust Production Planning in A Manufacturing Environment with Random Yield: A Case in Sawmill Production Planning.” European Journal of Operational Research 201 (3): 882–891. Kazemi Zanjani, M., M. Nourelfath, and D. Ait-Kadi. 2010. “A Multi-stage Stochastic Programming Approach for Production Planning with Uncertainty in the Quality of Raw Materials and Demand.” International Journal of Production Research 48 (16): 4701–4723. Kazemi Zanjani, M., M. Nourelfath, and D. Aït-Kadi. 2011. “Production Planning with Uncertainty in the Quality of Raw Materials: A Case in Sawmills.” Journal of the Operational Research Society 62 (7): 1334–1343. Kazemi Zanjani, M., D. Ait-Kadi, and M. Nourelfath. 2013. “A Stochastic Programming Approach for Sawmill Production Planning.” International Journal of Mathematics in Operational Research 5 (1): 1–18. Zanjani, M. K., D. Ait-Kadi, and M. Nourelfath. 2013. “An Accelerated Scenario Updating Heuristic for Stochastic Production Planning with Set-up Constraints in Sawmills.” International Journal of Production Research 51 (4): 993–1005. Pradenas, L., J. Garcés, V. Parada, and J. Ferland. 2013. “Genotype–Phenotype Heuristic Approaches for a Cutting Stock Problem with Circular Patterns.” Engineering Applications of Artificial Intelligence26 (10): 2349–2355. Zanjani, M. K., M. Nourelfath, and D. Ait-Kadi. 2013b. “A Scenario Decomposition Approach for Stochastic Production Planning in Sawmills.” Journal of the Operational Research Society 64 (1): 48–59. Arabi, M. 2013. “An Optimization and Simulation Framework for Integrated Tactical Planning of Wood Harvesting Operations and Lumber Production.” Master's thesis, Université Laval. Marier, P., S. Bolduc, M. B. Ali, and J. Gaudreault. 2014. “S&OP Network Model for Commodity Lumber Products. MOSIM 2014, 10ème Conférence Francophone de Modélisation, Optimisation et Simulation. Nancy, France. November, 2014. Alvarez, P. P., and J. R. Vera. 2014. “Application of Robust Optimization to the Sawmill Planning Problem.” Annals of Operations Research 219 (1): 457–475. Lindner, B. G., P. Vlok, and C. B. Wessels. 2015. “Determining Optimal Primary Sawing and Ripping Machine Settings in the Wood Manufacturing Chain.” Southern Forests: a Journal of Forest Science 77 (3): 191–201. Lobos, A., and J. R. Vera. 2016. “Intertemporal Stochastic Sawmill Planning: Modeling and Managerial Insights.” Computers & Industrial Engineering 95: 53–63. Palma, C. D., and F. P. Vergara. 2016. “A Multiobjective Model for the Cutting Pattern Problem with Unclear Preferences.” Forest Science 62 (2): 220–226. Huka, M. A., and M. Gronalt. 2017. “Model Development and Comparison of Different Heuristics for Production Planning in Large Volume Softwood Sawmills.” Engineering Optimization 49 (11): 1829–1847. Wery, J., J. Gaudreault, A. Thomas, and P. Marier. 2018. “Simulation-Optimisation Based Framework for Sales and Operations Planning Taking into Account New Products Opportunities in a Co-production Context.” Computers in Industry 94: 41–51. Galvez, J. L. A. P., D. Borenstein, and E. da Silveira Farias. 2018. “Application of Optimization for Solving a Sawing Stock Problem with a Cant Sawing Pattern.” Optimization Letters 12 (8): 1755–1772. Vanzetti, N., D. Broz, G. Corsano, and J. M. Montagna. 2018. “An Optimization Approach for Multiperiod Production Planning in a Sawmill.” Forest Policy and Economics 97: 1–8. Vanzetti, N., D. Broz, G. Corsano, and J. M. Montagna. 2019. “A Detailed Mathematical Programming Model for the Optimal Daily Planning of Sawmills.” Canadian Journal of Forest Research 49 (11): 1400–1411. Broz, D., N. Vanzetti, G. Corsano, and J. M. Montagna. 2019. “Goal Programming Application for the Decision Support in the Daily Production Planning of Sawmills.” Forest Policy and Economics 102: 29–40. Vanzetti, N., D. Broz, J. M. Montagna, and G. Corsano. 2019. “Integrated Approach for the Bucking and Production Planning Problems in Forest Industry.” Computers & Chemical Engineering 125: 155–163. Alvarez, P. P., A. Espinoza, S. Maturana, and J. Vera. 2020. “Improving Consistency in Hierarchical Tactical and Operational Planning Using Robust Optimization.” Computers & Industrial Engineering139: 106112. Pradenas, L., G. Bravo, and R. Linfati. 2020. “Optimization Model for Remanufacturing in a Real Sawmill.” Journal of Industrial Engineering, International 16 (2): 32–40. Gaudreault, J., J.-M. Frayret, A. Rousseau, and S. D'Amours. 2011. “Combined Planning and Scheduling in a Divergent Production System with Co-production: A Case Study in the Lumber Industry.” Computers & Operations Research 38 (9): 1238–1250. Cifuentes, N., G. Gatica, and R. Linfati. 2017. “Alinear Programming Model for the Parallel Non-related Machines Problem, in the Drying Area of a Chilean Sawmill.” Revista Facultad de Ingeniería 26 (46): 9–17. Theresia, J., I. G. A. Widyadana, and D. Wahjudi. 2019. “Optimal Kiln Dry Allocation for Dry Timber Preparation to Minimize Cost.” Jurnal Teknik Industri 21 (1): 43–48. Vanzetti, N., G. Corsano, and J. M. Montagna. 2020. “Drying Operation Planning in a Sawmill.” Computers & Chemical Engineering 137: 106817. Huka, M. A., C. Rindler, and M. Gronalt. 2020. “Scheduling and Loading Problem for Multiple, Identical Dry Kilns.” Flexible Services and Manufacturing Journal 33: 312–336. Marier, P., J. Gaudreault, and T. Noguer. 2021. “Kiln Drying Operations Scheduling with Dynamic Composition of Loading Patterns.” Forest Products Journal 71 (2): 101–110. Marier, P., J. Gaudreault, and B. Robichaud. 2014. “Implementing a Mip Model to Plan and Schedule Wood Finishing Operations in a Sawmill: Lessons Learned. MOSIM 2014, 10ème Conférence Francophone de Modélisation, Optimisation et Simulation. Nancy, France. Baesler, F., and C. Palma. 2014. “Multiobjective Parallel Machine Scheduling in The Sawmill Industry Using Memetic Algorithms.” The International Journal of Advanced Manufacturing Technology 74 (5): 757–768. Wessels, C. B., C. S. Price, P. Turner, and M. P. Dell. 2006. “Integrating harvesting and Sawmill Operations Using an Optimized Sawmill Production Planning System.International Precision Forestry Symposium. Stellenbosch, South Africa. March, 2006. Frayret, J.-M., S. D'Amours, A. Rousseau, S. Harvey, and J. Gaudreault. 2007. “Agent-Based Supply-Chain Planning in the Forest Products Industry.” International Journal of Flexible Manufacturing Systems 19 (4): 358–391. Cid, F., J. Frayret, A. Rousseau, and F. Léger. 2007. “Evaluation of Pull Strategies in Lumber Production Planning: A Case Stude. 19th International Conference on Production Research. Valparaiso, Chile. July, 2007. Singer, M., and P. Donoso. 2008. “Upstream or Downstream in The Value Chain?” Journal of Business Research 61 (6): 669–677. Forget, P., S. D'Amours, J.-M. Frayret, and J. Gaudreault. 2009. “Study of the Performance of Multi-behaviour Agents for Supply Chain Planning.” Computers in Industry 60 (9): 698–708. Cid Yáñez, F., J.-M. Frayret, F. Léger, and A. Rousseau. 2009. “Agent-based Simulation and Analysis of Demand-driven Production Strategies in the Timber Industry.” International Journal of Production Research 47 (22): 6295–6319. Beaudoin, D., J.-M. Frayret, and L. LeBel. 2010. “Negotiation-based Distributed Wood Procurement Planning Within a Multi-firm Environment.” Forest Policy and Economics 12 (2): 79–93. Marinescu, M. V., and T. C. Maness. 2010. “A Hierarchical Timber Allocation Model to Analyze Sustainable Forest Management Decisions.” Mathematical & Computational Forestry & Natural Resource Sciences 2 (2): 117–134. Gaudreault, J., P. Forget, J.-M. Frayret, A. Rousseau, S. Lemieux, and S. D'Amours. 2010. “Distributed Operations Planning in the Lumber Supply Chain: Models and Coordination.” International Journal of Industrial Engineering: Theory, Applications and Practice 17 (3): 168–189. Santa-Eulalia, L. A., D. Aït-Kadi, S. D'Amours, J.-M. Frayret, and S. Lemieux. 2011. “Agent-based Experimental Investigations of the Robustness of Tactical Planning and Control Policies in a Softwood Lumber Supply Chain.” Production Planning & Control 22 (8): 782–799. Gaudreault, J., G. Pesant, J.-M. Frayret, and S. D'Amours. 2012. “Supply Chain Coordination Using an Adaptive Distributed Search Strategy.” IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and Reviews) 42 (6): 1424–1438. Jerbi, W., J. Gaudreault, S. D'Amours, M. Nourelfath, S. Lemieux, P. Marier, and M. Bouchard. 2012. “Optimization/Simulation-Based Framework for the Evaluation of Supply Chain Management Policies in the Forest Product Industry. 2012 IEEE International Conference on Systems, Man, and Cybernetics (SMC). Seoul, Korea (south). October, 2012. Alayet, C., N. Lehoux, L. LeBel, and M. Bouchard. 2013. “Planning and Control Model for A Forest Supply Chain.” In Proceedings of the 2nd International Conference on Operations Research and Enterprise Systems. Vol. 1: ICORES, 5–13. SciTePress. Morneau-Pereira, M., M. Arabi, J. Gaudreault, M. Nourelfath, and M. Ouhimmou. 2014. “An Optimization and Simulation Framework for Integrated Tactical Planning of Wood Harvesting Operation, Wood Allocation and Lumber Production. MOSIM 2014, 10th Conférence Francophone de Modélisation, Optimisation et Simulation. Nancy, France. November 2014. Bajgiran, O. S., M. K. Zanjani, and M. Nourelfath. 2014. “Integrated tactical planning in lumber sypply chain. Industrial and System Engineering Research Conference. Montreal, Canada. May 31–June 3, 2014. Paradis, G., S. D'Amours, M. Bouchard, and L. LeBel. 2015. Extending the Classic Wood Supply Model to Anticipate Industrial Fibre Consumption. Vol. 6. University of Montreal, Montreal, Canada: Centre Inter-universitaire de Recherche sur les Réseaux d'Entreprise. Dumetz, L., J. Gaudreault, A. Thomas, H. Bril El-Haouzi, N. Lehoux, and P. Marier. 2017. Planning and Coordination for Decentralised Business Units in a Lumber Production Company, January. Working Paper or Preprint. Fuentealba, S., L. Pradenas, R. Linfati, and J. A. Ferland. 2019. “Forest Harvest and Sawmills: An Integrated Tactical Planning Model.” Computers and Electronics in Agriculture 156: 275–281. Pradenas, L., F. Peñailillo, and J. Ferland. 2004. “Aggregate Production Planning Problem. A New Algorithm.” Electronic Notes in Discrete Mathematics 18: 193–199. Lindner, B., T. Visser, and B. Wessels. 2013. “A Model to Optimise the Linked Sawing and Ripping Decision in the South African Pine Wood Industry. 42nd Annual Conference of the Operations Research Society of South Africa. Stellenbosch, South Africa. Shahi, S., and R. Pulkki. 2015. “A Simulation-Based Optimization Approach to Integrated Inventory Management of a Sawlog Supply Chain with Demand Uncertainty.” Canadian Journal of Forest Research 45 (10): 1313–1326. Vila, D., R. Beauregard, and A. Martel. 2009. “The Strategic Design of Forest Industry Supply Chains.” INFOR: Information Systems and Operational Research 47 (3): 185–202. Vahidian, N. 2012. “Comparison of Deterministic and Stochastic Production Planning Approaches in Sawmills by Integrating Design of Experiments and Monte-Carlo simulation.” PhD diss., Concordia University Montreal. Zanjani, M. K., M. Nourelfath, and D. Ait-Kadi. 2013a. “Sawmill Production Planning Under Uncertainty: Modelling and Solution Approaches.” In Stochastic Programming: Applications in Finance, Energy, Planning and Logistics. Vol. 4, 347–395. Singapore: World Scientific. Varas, M., S. Maturana, R. Pascual, I. Vargas, and J. Vera. 2014. “Scheduling Production for a Sawmill: A Robust Optimization Approach.” International Journal of Production Economics 150: 37–51. Forget, P., S. D'Amours, and J.-M. Frayret. 2008. “Multi-Behavior Agent Model for Planning in Supply Chains: An Application to the Lumber Industry.” Robotics and Computer-Integrated Manufacturing24 (5): 664–679. Lemieux, S., S. D'Amours, J. Gaudreault, and J.-M. Frayret. 2009. “Agent-Based Simulation to Anticipate Impacts of Tactical Supply Chain Decision-Making in the Lumber Industry.” International Journal of Flexible Manufacturing Systems 19 (4): 358–391. Gaudreault, J., J.-M. Frayret, and G. Pesant. 2009. “Distributed Search for Supply Chain Coordination.” Computers in Industry 60 (6): 441–451. Vahid, S. 2011. “An Agent-based Supply Chain Model for Strategic Analysis in Forestry.” PhD diss., University of British Columbia.