2,127
Views
3
CrossRef citations to date
0
Altmetric
Research Articles

Catastrophe insurance and flexible planning for supply chain disruption management: a stochastic simulation case study

ORCID Icon, ORCID Icon, ORCID Icon & ORCID Icon
Pages 1108-1125 | Received 19 Apr 2022, Accepted 24 Jan 2023, Published online: 15 Feb 2023

Figures & data

Figure 1. SC structure.

The structure of the multi-echelon global supply chain network and flows of materials, parts, and finished products from upstream supply chain nodes to downstream supply chain nodes.
Figure 1. SC structure.

Figure 2. The global SC network.

A Google maps depiction of part of the SC network. Links between nodes only represent connections, not routes.
Figure 2. The global SC network.

Figure 3. Stages and timeline.

Stages and timeline of the two-stage stochastic programming model.
Figure 3. Stages and timeline.

Table 1. Sets.

Table 2. Parameters.

Table 3. Variables.

Table 4. Experiment results.

Supplemental material

Supplemental Material

Download PDF (236.5 KB)

Data availability statement

The data that support the findings of this article are available from the corresponding author, Y. Fan. upon reasonable request.