2,768
Views
4
CrossRef citations to date
0
Altmetric
Articles

Construction logistics in a multi-project context: coopetition among main contractors and the role of third-party logistics providers

ORCID Icon, , &
Pages 25-40 | Received 11 Feb 2021, Accepted 28 Nov 2021, Published online: 13 Dec 2021

Figures & data

Figure 1. The ARA Model, adapted from Håkansson (Citation1987).

Figure 1. The ARA Model, adapted from Håkansson (Citation1987).

Table 1. Summary of interviews.

Table 2. Description of construction projects and main contractors in the studied stage.

Figure 2. Disposition plan of the studied stage.

Figure 2. Disposition plan of the studied stage.