65
Views
0
CrossRef citations to date
0
Altmetric
Civil Engineering

Subway station construction parallelly below existing double-cell tunnel without clearance

, , , , & ORCID Icon
Pages 192-203 | Received 02 Jul 2023, Accepted 14 Dec 2023, Published online: 05 Jan 2024
 

ABSTRACT

A case of the Olympic Park Station of Beijing Subway Line 15 constructed parallelly below the Datun Road Tunnel without clearance using the pile-beam-arch (PBA) method was presented. Cross section, geological condition, and construction process of the subway station are illustrated. The strip foundation PBA approach was first adopted and the settlements of the existing tunnel due to new subway station construction are systematically monitored. Whereas this method could not satisfy the settlement requirements of the existing Datun Road Tunnel. The maximum settlement of the existing tunnel reaches 32.0 mm. Meanwhile, the maximum transverse differential settlement of the existing tunnel reaches 10.1 mm. The improved pile foundation PBA approach was proposed. The numerical simulation was performed to verify the feasibility. The results indicate that the pile foundation PBA approach is more efficient in existing tunnel settlement control than the strip foundation PBA approach. About 80% of the total settlement of the existing tunnel caused by subway station construction using the pile foundation PBA method is produced during the excavation of the drifts and the arches. The settlements of the original tunnel induced by the construction of the concourse and the platform account for about 20% of the total settlement. The increments are negligible after the completion of the concourse construction.

CO EDITOR-IN-CHIEF:

ASSOCIATE EDITOR:

Disclosure statement

No potential conflict of interest was reported by the author(s).

Additional information

Funding

This work was supported by the Fundamental Research Funds for the Central Universities under Grant 2022JBZY038; the National Natural Science Foundation of China under Grant 52178379; Program for Young Talents of Science and Technology in Universities of Inner Mongolia Autonomous Region under Grant NJYT23103.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 199.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.