149
Views
18
CrossRef citations to date
0
Altmetric
Original Articles

A note on resource allocation scheduling with position-dependent workloads

&
Pages 1810-1827 | Received 22 Jun 2017, Accepted 20 Nov 2017, Published online: 29 Dec 2017
 

ABSTRACT

In this note, single machine scheduling with concurrent resource allocation and position-dependent workloads is studied. The aim is to find jointly the optimal sequence and the optimal resource allocation. A bicriteria analysis of the problem is provided where the first criterion is to minimize the scheduling cost (i.e. makespan, total completion time, total absolute differences in completion times, total absolute differences in waiting times) and the second criterion is to minimize the total resource consumption cost. It is proved that four bicriteria problems can be solved efficiently.

Disclosure statement

No potential conflict of interest was reported by the authors.

Additional information

Funding

This research was supported by the National Natural Science Foundation of China [grant no. 71501082].

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 1,161.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.