ABSTRACT
We analyze the train types handled at a section station and the factors affecting the scheduling of the arrival–departure track operation, using the following conditions as our optimization goals: operating the arrival–departure tracks in accordance with a fixed operation scheme, and reducing the influence which the departing–receiving operations impose on shunting operations. We establish a 0–1 integer programming model for formulating a track operation plan. By applying modern sequencing theory, this is transformed into a fixed sequencing model of special parallel machines. We then design a heuristic algorithm to solve the model. Finally, the example of Yiyang railway station is used to verify the advantages of the model and the algorithm. A better operation plan is obtained using MATLAB 7.0 by applying the model and the algorithm provided in the paper, indicating the superiority of our study’s approach.
Acknowledgement
We would like to thank the anonymous referees for their comments and suggestions.
Disclosure statement
No potential conflict of interest was reported by the authors.