Table 1. THE 10 CLUSTERS IDENTIFIED WITH THE HELP OF INDUSTRY EXPERTS AND THE TASKS INVOLVED.
Table 2. MONTHLY COST PER CREW MEMBER AND FOR THE TOTAL CREW IN A CONVENTIONAL SITUATION [CREW COST AND CREW COMPOSITION PROVIDED BY JR SHIPPING].
Table 3. SUMMARY OF THE PRESENTED SOLUTIONS AND THE EXPECTED IMPLEMENTATION TIME OF THE SOLUTIONS.
Table 4. REQUIRED CREW MEMBERS PER CLUSTER, SORTED BY TRAVEL PHASE PER DEPARTMENT [OUTPUT FROM AUTHOR’S PUSPOSE BUILT CREW ANALYSIS ALGORITHM].
Figure 3. DIFFERENCE IN SCENARIO DISTRIBUTION (CUMULATIVE) SHOWING A SIGNIFICANT DIFFERENCE BETWEEN THE REQUIRED CREW FOR THE RELAXED ASSIGNMENT AND THE TRADITIONAL ASSIGNMENT.
![Figure 3. DIFFERENCE IN SCENARIO DISTRIBUTION (CUMULATIVE) SHOWING A SIGNIFICANT DIFFERENCE BETWEEN THE REQUIRED CREW FOR THE RELAXED ASSIGNMENT AND THE TRADITIONAL ASSIGNMENT.](/cms/asset/4c2d90af-3adf-4f9d-903a-31e4a7b383f6/tmpm_a_1914878_f0003_oc.jpg)
Figure 4. HEAT MAP FOR MONTHLY CREW COST PER SCENARIO AS A FUNCTION OF THE NUMBER OF CLUSTERS AUTOMATED.
![Figure 4. HEAT MAP FOR MONTHLY CREW COST PER SCENARIO AS A FUNCTION OF THE NUMBER OF CLUSTERS AUTOMATED.](/cms/asset/98bbe63a-27a0-490a-baae-c26c7e9d0098/tmpm_a_1914878_f0004_oc.jpg)
Table 5. COMPREHENSIVE SUMMARY OF THE REQUIRED NUMBER OF CREW MEMBERS PER REDUCTION STEP [OUTPUT FROM AUTHOR’S PURPOSE BUILT CREW ANALYSIS ALGORITHM].