1,084
Views
18
CrossRef citations to date
0
Altmetric
Articles

Flood analysis and flood projections under climate change in New Brunswick

, &
Pages 319-330 | Received 22 Aug 2014, Accepted 06 Jul 2015, Published online: 14 Aug 2015

Figures & data

Figure 1. Hydrometric and meteorological stations in New Brunswick. The (a) 56 hydrometric stations and (b) four grid boxes corresponding to New Brunswick used in climate change scenarios. Box size ~200 × 300 km; • hydrometric station;

meteorological station.

Figure 1. Hydrometric and meteorological stations in New Brunswick. The (a) 56 hydrometric stations and (b) four grid boxes corresponding to New Brunswick used in climate change scenarios. Box size ~200 × 300 km; • hydrometric station; Display full size meteorological station.

Table 1. Analysed hydrometric stations for the flood frequency analysis (from Aucoin et al. Citation2011).

Table 2. Meteorological stations (from El-Jabi et al. Citation2013).

Table 3. Hydrometric stations (from El-Jabi et al. Citation2013).

Figure 2. Flood frequency analysis for Renous River (NB), station 01BO002.

Figure 2. Flood frequency analysis for Renous River (NB), station 01BO002.

Table 4. Regional regression equations and R2 Generalized Extreme Value (GEV) (from Aucoin et al. Citation2011).

Figure 3. Estimated 100-year flood (daily discharge) as a function of drainage area (km2) for all 56 hydrometric stations (Generalized Extreme Value (GEV) and Lognormal type 3 (LN3)). Regional regression line for both the present study and the EC & NB study (Citation1987) are presented.

Figure 3. Estimated 100-year flood (daily discharge) as a function of drainage area (km2) for all 56 hydrometric stations (Generalized Extreme Value (GEV) and Lognormal type 3 (LN3)). Regional regression line for both the present study and the EC & NB study (Citation1987) are presented.

Figure 4. Observed and simulated monthly discharges for SW Miramichi River: (a) mean discharge; (b) maximum discharge.

Figure 4. Observed and simulated monthly discharges for SW Miramichi River: (a) mean discharge; (b) maximum discharge.

Figure 5. New Brunswick regional climate index (RCI) curves for floods at time slices 2010–2039, 2040–2069, 2070–2099 under (a) scenario B1; (b) scenario A2 (adapted from El-Jabi et al. Citation2013).

Figure 5. New Brunswick regional climate index (RCI) curves for floods at time slices 2010–2039, 2040–2069, 2070–2099 under (a) scenario B1; (b) scenario A2 (adapted from El-Jabi et al. Citation2013).

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.