Stability and resource allocation in project planning

&
Pages 667-682 | Received 01 Dec 2002, Accepted 01 Nov 2003, Published online: 17 Aug 2010
 

Abstract

The majority of resource-constrained project scheduling efforts assume perfect information about the scheduling problem to be solved and a static deterministic environment within which the precomputed baseline schedule is executed. In reality, project activities are subject to considerable uncertainty, which generally leads to numerous schedule disruptions. In this paper, we present a resource allocation model that protects a given baseline schedule against activity duration variability. A branch-and-bound algorithm is developed that solves the proposed resource allocation problem. We report on computational results obtained on a set of benchmark problems.

Notes

*6.5% of the problems ran out of storage space for the MFSs for n = 61, is considered as ‘not solved to optimality,’

**is not taken into account on computing the average values for the corresponding table entries marked by ‘**’.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 202.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.