324
Views
3
CrossRef citations to date
0
Altmetric
Articles

Understanding Predictors of Over-Optimism in IS Project Teams

&
Pages 85-92 | Published online: 07 Dec 2017
 

ABSTRACT

The primary objective of this study is to examine the influence that psychological factors have on project team members’ degree of over-optimism regarding successful project completion. Specifically, we examine the impact that select personality traits and psychological states have on project team members’ degree of over-optimism about bringing a project to a successful completion. A field survey methodology was employed to survey IT project team members from Fortune 500 companies and the research model was tested using structural equation modeling. Results indicate that project-specific self-efficacy has both a direct positive effect on over-optimism and an indirect effect via the implementation mindset construct. General self-efficacy was demonstrated to directly influence project-specific self-efficacy and indirectly influence over-optimism via the implementation mindset construct. Preference for consistency was also demonstrated to have a direct effect on over-optimism. Implications for developing interventions to minimize the impacts of over-optimism related to IT projects are discussed.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 145.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.