Key determinants of performance of design-bid-build projects in Singapore

Pages 128-139 | Published online: 13 May 2010
 

Abstract

What are the factors affecting the performance of design-bid-build projects? Ten performance metrics and 60 factors are identified that project team members can use to measure and manage the success levels of construction projects in four broad categories: cost, time, quality and administrative burden. A survey and correlation analysis of 65 design-bid-build projects in Singapore is used to suggest the factors that affect each performance metric significantly. Contractor characteristics are the key determinants affecting the highest number of performance metrics. The most significant variable is the contractor's past record for completing projects on budget and to an acceptable level of quality. Based on this evidence, it is recommended that clients and consultants pay closer attention to a wider array of characteristics (not just the initial price) involving contractor selection. Another key determinant is the project character with the most important variable being the percentage of repetitive elements.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 53.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 665.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.