2,558
Views
1
CrossRef citations to date
0
Altmetric
Bridge Conceptual and Aesthetic Design

Approach to Robust and Elegant Bridge Design

, PhD & , PhD

Figures & data

Fig. 1: Structural design flowchart

Fig. 1: Structural design flowchart

Fig. 2: Location of the Hauterive viaduct: (a) plan view; (b) surrounds

Fig. 2: Location of the Hauterive viaduct: (a) plan view; (b) surrounds

Fig. 3: Structural idea for the Hauterive viaduct: (a) elevation (no construction possible in areas marked ‘N’); (b) cross-section of trough superstructure around the pylon, monolithically connected to the slanted pylon shafts and ties

Fig. 3: Structural idea for the Hauterive viaduct: (a) elevation (no construction possible in areas marked ‘N’); (b) cross-section of trough superstructure around the pylon, monolithically connected to the slanted pylon shafts and ties

Fig. 4: Incremental launching during construction of the bridge over the River PachiteaCitation24 (© CESMA Ingenieros SL – Madrid)

Fig. 4: Incremental launching during construction of the bridge over the River PachiteaCitation24 (© CESMA Ingenieros SL – Madrid)

Fig. 5: Competition entry (Dr Lüchinger + Meyer Bauingenieure AG – Zürich; CESMA Ingenieros SL – Madrid; Ilg Santer Architekten – Zürich): (a) longitudinal section; (b) bridge pier P-8; (c) superstructure cross-section (Units: m)

Fig. 5: Competition entry (Dr Lüchinger + Meyer Bauingenieure AG – Zürich; CESMA Ingenieros SL – Madrid; Ilg Santer Architekten – Zürich): (a) longitudinal section; (b) bridge pier P-8; (c) superstructure cross-section (Units: m)

Fig. 6: Model of the solution proposed and surrounds (model building: Zaborowsky Modellbau GmbH)

Fig. 6: Model of the solution proposed and surrounds (model building: Zaborowsky Modellbau GmbH)

Fig. 7: Verification of post-tie failure system behaviour in a redundantly designed, extradosed bridge

Fig. 7: Verification of post-tie failure system behaviour in a redundantly designed, extradosed bridge

Fig. 8: Verification of post-pylon failure built-in fuse and system behaviour in a redundantly designed, extradosed bridge

Fig. 8: Verification of post-pylon failure built-in fuse and system behaviour in a redundantly designed, extradosed bridge