Results of surface hot-in place recycling (remix) of modified and alternative asphalt mixtures in Finland. Part II: bitumen scale

ORCID Icon, & ORCID Icon
Article: 2134569 | Received 08 Apr 2022, Accepted 03 Oct 2022, Published online: 04 Nov 2022

Figures & data

Table 1. Roads, codes, and conventions of the project.

Table 2. Roads and materials of the project.

Figure 1. Flowchart of the test plan. Bitumen scale results are presented herein. Mixture scale results are presented in Part I.

Figure 1. Flowchart of the test plan. Bitumen scale results are presented herein. Mixture scale results are presented in Part I.

Figure 2. Example of gradations of the materials from the project, before and after REM. Notice that the materials labelled OKTO SMA and OKTO AC both follow and SMA-type gradation.

Figure 2. Example of gradations of the materials from the project, before and after REM. Notice that the materials labelled OKTO SMA and OKTO AC both follow and SMA-type gradation.

Figure 3. Change in percentage passing (gradations), after REM/RUT. (a) Ylöjärvi, (b) Kilvakkala, (c) Riihimäki, (d) Oulu. Notes. Changes in the AV and RV locations are presented separately for Ylöjärvi, Kilvakkala and Riihimäki. A diagram with the AV/RV locations is presented in Paper I.

Figure 3. Change in percentage passing (gradations), after REM/RUT. (a) Ylöjärvi, (b) Kilvakkala, (c) Riihimäki, (d) Oulu. Notes. Changes in the AV and RV locations are presented separately for Ylöjärvi, Kilvakkala and Riihimäki. A diagram with the AV/RV locations is presented in Paper I.

Figure 4. Bitumen content of the specimens, before and after REM/RUT, all roads. Ylöjärvi (●), Kilvakkala (▴). The values from Ylöjärvi are linked with a line. Notes: STO before REM is likely lower than presented. ARA bitumen does not contain fibres after extraction.

Figure 4. Bitumen content of the specimens, before and after REM/RUT, all roads. Ylöjärvi (●), Kilvakkala (▴). The values from Ylöjärvi are linked with a line. Notes: STO before REM is likely lower than presented. ARA bitumen does not contain fibres after extraction.

Figure 5. Change in bitumen content after REM/RUT. Ylöjärvi (●), Kilvakkala (▴). The values from Ylöjärvi are linked with a line. ARA bitumen does not contain fibres after extraction.

Figure 5. Change in bitumen content after REM/RUT. Ylöjärvi (●), Kilvakkala (▴). The values from Ylöjärvi are linked with a line. ARA bitumen does not contain fibres after extraction.

Figure 6. Penetration for all bitumens, before and after REM/RUT. Ylöjärvi (●), Kilvakkala (▴). The values from Ylöjärvi are linked with a line. Notice that one bitumen has been compounded per material from the AV and RV specimens. ARA bitumen does not contain fibres after extraction.

Figure 6. Penetration for all bitumens, before and after REM/RUT. Ylöjärvi (●), Kilvakkala (▴). The values from Ylöjärvi are linked with a line. Notice that one bitumen has been compounded per material from the AV and RV specimens. ARA bitumen does not contain fibres after extraction.

Figure 7. Change in penetration after REM/RUT. Ylöjärvi (●), Kilvakkala (▴). The values from Ylöjärvi are linked with a line. ARA bitumen does not contain fibres after extraction.

Figure 7. Change in penetration after REM/RUT. Ylöjärvi (●), Kilvakkala (▴). The values from Ylöjärvi are linked with a line. ARA bitumen does not contain fibres after extraction.

Figure 8. Softening point for all materials, before and after REM/RUT. Ylöjärvi (●), Kilvakkala (▴). The values from Ylöjärvi are linked with a line. One bitumen has been compounded per material from the AV and RV specimens. ARA bitumen does not contain fibres after extraction.

Figure 8. Softening point for all materials, before and after REM/RUT. Ylöjärvi (●), Kilvakkala (▴). The values from Ylöjärvi are linked with a line. One bitumen has been compounded per material from the AV and RV specimens. ARA bitumen does not contain fibres after extraction.

Figure 9. Change in softening point after REM/RUT. Ylöjärvi (●), Kilvakkala (▴). The values from Ylöjärvi are linked with a line. ARA bitumen does not contain fibres after extraction.

Figure 9. Change in softening point after REM/RUT. Ylöjärvi (●), Kilvakkala (▴). The values from Ylöjärvi are linked with a line. ARA bitumen does not contain fibres after extraction.

Table 3. Range of temperatures with meaningful DSR results within the tested frequency range, all bitumens, before and after remix/rut-remix.

Figure 10. Illustrating the process of shifting original data towards a master curve. Notice the shift factors (aT) and the reference temperature 20°C. (a) Complex shear modulus, (b) phase angle. Bitumen: Kilvakkala ARA* after REM, 8-mm.

Figure 10. Illustrating the process of shifting original data towards a master curve. Notice the shift factors (aT) and the reference temperature 20°C. (a) Complex shear modulus, (b) phase angle. Bitumen: Kilvakkala ARA* after REM, 8-mm.

Figure 11. Master curves, (a) shear complex modulus and (b) phase angle, for all bitumens before REM/RUT. Left side: 8-mm plate (70 to 0°C). Right side: 4-mm plate (6 to −30°C). ARA bitumen does not contain fibres after extraction.

Figure 11. Master curves, (a) shear complex modulus and (b) phase angle, for all bitumens before REM/RUT. Left side: 8-mm plate (70 to 0°C). Right side: 4-mm plate (6 to −30°C). ARA bitumen does not contain fibres after extraction.

Figure 12. Master curves, (a) shear complex modulus and (b) phase angle, for all bitumens after REM/RUT. Left side: 8-mm plate (70 to 0°C). Right side: 4-mm plate (6 to −30°C). ARA bitumen does not contain fibres after extraction.

Figure 12. Master curves, (a) shear complex modulus and (b) phase angle, for all bitumens after REM/RUT. Left side: 8-mm plate (70 to 0°C). Right side: 4-mm plate (6 to −30°C). ARA bitumen does not contain fibres after extraction.

Figure 13. Change in (a) shear complex modulus and (b) phase angle, for all bitumens after REM/RUT. Left side: 8-mm plate (70 to 0°C). Right side: 4-mm plate (6 to −30°C). ARA bitumen does not contain fibres after extraction.

Figure 13. Change in (a) shear complex modulus and (b) phase angle, for all bitumens after REM/RUT. Left side: 8-mm plate (70 to 0°C). Right side: 4-mm plate (6 to −30°C). ARA bitumen does not contain fibres after extraction.

Figure 14. Complex modulus and Phase angle at Glover-Rowe conditions, all bitumens, (a) before and (b) after REM/RUT. Notice the names of the areas to the right. ARA bitumen does not contain fibres after extraction.

Figure 14. Complex modulus and Phase angle at Glover-Rowe conditions, all bitumens, (a) before and (b) after REM/RUT. Notice the names of the areas to the right. ARA bitumen does not contain fibres after extraction.

Figure 15. Change in modulus and phase angle after REM/RUT at Glover-Rowe conditions, all bitumens. ARA bitumen does not contain fibres after extraction.

Figure 15. Change in modulus and phase angle after REM/RUT at Glover-Rowe conditions, all bitumens. ARA bitumen does not contain fibres after extraction.

Figure 16. Summary of results of the MSCR test for the bitumens before and after remix/rut-remix, at five temperatures: 50, 52, 58, 60, and 70°C. ARA bitumen does not contain fibres after extraction.

Figure 16. Summary of results of the MSCR test for the bitumens before and after remix/rut-remix, at five temperatures: 50, 52, 58, 60, and 70°C. ARA bitumen does not contain fibres after extraction.

Figure 17. Summary of results of the MSCR test for PAB, before and after REM, at temperatures 20, 22, 28, 30, 34, and 40°C before REM, and 28, 30, 34, 40, 46, and 50°C after REM.

Figure 17. Summary of results of the MSCR test for PAB, before and after REM, at temperatures 20, 22, 28, 30, 34, and 40°C before REM, and 28, 30, 34, 40, 46, and 50°C after REM.

Figure 18. Change in non-recoverable creep compliance after remix/rut remix, i.e. percent change in Jnr(3,2). ARA bitumen does not contain fibres after extraction.

Figure 18. Change in non-recoverable creep compliance after remix/rut remix, i.e. percent change in Jnr(3,2). ARA bitumen does not contain fibres after extraction.

Table 4. Summary of comments on performance. Bitumen scale.