951
Views
0
CrossRef citations to date
0
Altmetric
Technical Papers

Analysis of waste management issues arising from a field study evaluating decontamination of a biological agent from a building

, , , , , , , & show all
Pages 17-27 | Received 28 Jul 2015, Accepted 16 Sep 2015, Published online: 31 Dec 2015

Figures & data

Figure 1. INL Building PBF-632 with and without secondary containment enclosure.

Figure 1. INL Building PBF-632 with and without secondary containment enclosure.

Figure 2. Timeline of events within each round.

Figure 2. Timeline of events within each round.

Figure 3. Waste management concept.

Figure 3. Waste management concept.

Table 1. “Real (INL)” waste categories.

Table 2. BOTE Project waste management measurements and frequency.

Table 3. Waste data from BOTE Phase 1.

Figure 4. Daily solid waste generation.

Figure 4. Daily solid waste generation.

Figure 5. Distribution of waste by activity (normalized to 100%).

Figure 5. Distribution of waste by activity (normalized to 100%).

Figure 6. Solid waste by category.

Figure 6. Solid waste by category.

Figure 7. Aqueous waste by category.

Figure 7. Aqueous waste by category.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.