The disassembly of Annabell and JoyceFootnote*

Pages 10-25 | Received 11 Oct 2013, Accepted 12 Apr 2014, Published online: 15 Dec 2015

Figures & data

Figure 1. Legacy Way tunnel alignment.

Figure 1. Legacy Way tunnel alignment.

Figure 2. Tunnel boring machine- overall length.

Figure 2. Tunnel boring machine- overall length.

Figure 3. TBM shield and face of the cutterhead.

Figure 3. TBM shield and face of the cutterhead.

Figure 4. Preassembly of the TBM.

Figure 4. Preassembly of the TBM.

Figure 5. Eastern portal TBM disassembly box – available access indicated by blue arrows (roof removed).

Figure 5. Eastern portal TBM disassembly box – available access indicated by blue arrows (roof removed).

Figure 6. Components of hydraulic jacking System- Blue arrows indicating movement of different components.

Figure 6. Components of hydraulic jacking System- Blue arrows indicating movement of different components.

Figure 7. Rolling and turning operations.

Figure 7. Rolling and turning operations.

Figure 8. Actual TBM disassembly programme (Refer to Section 7: Stages of the TBM disassembly for information about the backfilling operations).

Figure 8. Actual TBM disassembly programme (Refer to Section 7: Stages of the TBM disassembly for information about the backfilling operations).

Figure 9. Operations inside jacking system envelope.

Figure 9. Operations inside jacking system envelope.

Figure 10. TBM disassembly stages – roof removed.

Figure 10. TBM disassembly stages – roof removed.

Figure 11. Jacking system layout for Joyce shield.

Figure 11. Jacking system layout for Joyce shield.

Figure 12. Turning of the main drive.

Figure 12. Turning of the main drive.

Figure 13. Rolling of the Gripper shield side segment.

Figure 13. Rolling of the Gripper shield side segment.

Table 1. Crane speed comparison showing maximum achievable speeds.

Figure 14. Jacking system layout for Joyce gantry.

Figure 14. Jacking system layout for Joyce gantry.

Figure 15. Joyce gantry component being disassembled.

Figure 15. Joyce gantry component being disassembled.

Figure 16. Jacking system layout for Annabell gantry.

Figure 16. Jacking system layout for Annabell gantry.

Figure 17. Annabell gantry component being disassembled

Figure 17. Annabell gantry component being disassembled

Figure 18. Cutterhead turning with Jacking System.

Figure 18. Cutterhead turning with Jacking System.

Figure 19. Stages of cutterhead segments removal – arrow indicating the orientation; Yellow members indicating temporary steel stands.

Figure 19. Stages of cutterhead segments removal – arrow indicating the orientation; Yellow members indicating temporary steel stands.

Figure 20. Cutterhead segment 1 being lowered.

Figure 20. Cutterhead segment 1 being lowered.

Figure 21. Cutterhead segment being moved with skating system.

Figure 21. Cutterhead segment being moved with skating system.

Figure 22. Jacking system layout for Annabell shield.

Figure 22. Jacking system layout for Annabell shield.

Figure 23. SPT performing ‘U’ turn after picking up a shield segment- Looking from Eastbound (Joyce) portal.

Figure 23. SPT performing ‘U’ turn after picking up a shield segment- Looking from Eastbound (Joyce) portal.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.