Figure 1. An EIA consists of two tendering opportunities, the first for selecting a consultant to commission for conducting the EIA, and the second for selecting a contractor to construct/implement the project.
![Figure 1. An EIA consists of two tendering opportunities, the first for selecting a consultant to commission for conducting the EIA, and the second for selecting a contractor to construct/implement the project.](/cms/asset/1e03fed0-3cd2-4ef0-a0fa-ee782cfe57fb/tiap_a_2359805_f0001_b.gif)
Figure 2. An illustration of the components of the EIA tendering process, covering the three phases, i. pre-tender phase, ii. tender phase, and iii. post-tender phase.
![Figure 2. An illustration of the components of the EIA tendering process, covering the three phases, i. pre-tender phase, ii. tender phase, and iii. post-tender phase.](/cms/asset/fc531795-f726-4c95-a3f7-ac75bf9f85ae/tiap_a_2359805_f0002_b.gif)
Figure 4. A depiction of relational pathways between spaces for practice, as provided in Ravn Boess (Citation2023, p. 7).
![Figure 4. A depiction of relational pathways between spaces for practice, as provided in Ravn Boess (Citation2023, p. 7).](/cms/asset/dc230cca-04c2-41d0-9db8-8b320a09143f/tiap_a_2359805_f0004_b.gif)
Table 1. A description of the participants, and purpose of the key interactions between actors in the M5 case study.
Figure 5. The navigation between ‘spaces for practice’ in the pre-tender phase of the M5 EIA tendering process, involving developers, researchers, and authorities.
![Figure 5. The navigation between ‘spaces for practice’ in the pre-tender phase of the M5 EIA tendering process, involving developers, researchers, and authorities.](/cms/asset/7528dfdf-2d00-461a-abf6-4b2b32df2384/tiap_a_2359805_f0005_oc.jpg)
Figure 6. The navigation between ‘spaces for practice’ in the tender phase of the M5 EIA tendering process, involving consultants and developers.
![Figure 6. The navigation between ‘spaces for practice’ in the tender phase of the M5 EIA tendering process, involving consultants and developers.](/cms/asset/8ef9e9f9-112e-4203-adda-41976581ca90/tiap_a_2359805_f0006_oc.jpg)
Figure 7. The navigation between ‘spaces for practice’ in the post-tender phase of the M5 EIA tendering process, involving developers, consultants, authorities, and researchers.