450
Views
6
CrossRef citations to date
0
Altmetric
Articles

Reengineering business processes to improve an integrated industrial roundwood and energywood procurement chain

, , &
Pages 233-248 | Received 25 Jul 2012, Accepted 18 Oct 2013, Published online: 19 Nov 2013
 

Abstract

Procurement systems and supply chains for industrial-scale forest fuel recovery are still immature. Business process improvement techniques can significantly improve system performance. The present study applies business process modeling and reengineering approaches to an integrated industrial roundwood and energywood supply chain in Germany. The existing business process was reengineered. A new business process for integrated industrial roundwood and energywood procurement and two new business processes for future biomass procurement operations were designed using proven best practices. The improvement potential of the new business processes was investigated by determining the organizational and managerial workload of all actors using discrete-event simulation. The results of the discrete-event simulation were then used as a basis for a comprehensive cost calculation. Finally, the cost-saving potential relative to the current practice was determined. The redesign of the current business process provides a cost-saving potential of 20–39% (–2.64 to –5.25 USD/m3). The first biomass procurement process involves a saving potential of 12–53% (–1.60 to –7.20 USD/m3), while the second might even increase the costs by 13% if the probability of failures is high. With decreasing probability of failures, the costs can decrease by up to 32% (+1.76 to –4.27 USD/m3). The study demonstrates that simple and low-cost measures can improve business processes in forest supply chains and achieve considerable cost savings.

Acknowledgements

The authors would like to thank all the enterprises and entrepreneurs who provided their valuable time and data, especially Metsäpalvelu Turunen in Eno, Waldbesitzervereinigung Holzkirchen, and MW Biomasse in Feldkirchen-Westerham. Furthermore, the authors would like to thank Lars Eliasson of Skogforsk in Uppsala, Sweden, for providing his expertise for the opportunity cost calculations.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 229.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.