Parametric CAPEX, OPEX, and LCOE expressions for offshore wind farms based on global deployment parameters

, &

Figures & data

Figure 1. Water depth vs. distance to shore vs. wind farm capacity.

Figure 1. Water depth vs. distance to shore vs. wind farm capacity.

Figure 2. Turbine rating vs. wind farm year of commissioning.

Figure 2. Turbine rating vs. wind farm year of commissioning.

Figure 3. Breakdown of life-cycle costs.

Figure 3. Breakdown of life-cycle costs.

Figure 4. Integrated cost model structure.

Figure 4. Integrated cost model structure.

Table 1. Baseline specifications.

Table 2. Results from the application of the model to a number of scenarios.

Table 3. Testing scenarios and results produced by model and parametric expressions.

Figure 5. Sensitivity analysis of each parameter: (a) wind turbine rating, (b) distance from port, (c) water depth, and (d) wind farm capacity.