Coupling Simulation of Human-Environmental Safety Risk Factors in Metro Construction – a Case Study of Rongjiazhai Station at Xi’an Metro Line 5 in China

, ORCID Icon, &

Figures & data

Figure 1. Risk indicators in metro construction safety system.

Figure 1. Risk indicators in metro construction safety system.

Table 1. Weighting indices of human and environmental factors

Table 2. Definition of safety risk classification for metro construction

Table 3. Expert scoring and reverse cloud model digital features

Table 4. Human-environmental risk coupled system SD model variable set and value

Figure 2. Human-environmental coupling risk causality loop diagram.

Figure 2. Human-environmental coupling risk causality loop diagram.

Figure 3. Human-environmental coupling risk flow rate diagram.

Figure 3. Human-environmental coupling risk flow rate diagram.