Time and cost overruns in the UAE construction industry: a critical analysis

&
Pages 402-411 | Published online: 13 Nov 2018
 

Abstract

Time and cost are the two main indicators of success in a construction project as it affects all the project participants with equal positive and negative effects. Yet, poor time and cost performance have been a critical issue prevailing in the global construction market and UAE have not been an exception. This research adopted a concurrent mixed-methods approach, utilizing a questionnaire and an interview with UAE construction professionals, to analyse the major causes of this poor time and cost performance. The top five causes for time overrun were concluded as design variation from client and consultant, unrealistic schedules and completion dates projected by clients, delay in obtaining government permits and approvals, inaccurate time estimation by the consultants and change orders from clients. Whereas, the top five causes of cost overrun were summarized as design variation, poor cost estimation, delay in client’s decision-making process, financial constraints of client and inappropriate procurement method.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 158.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.