Stochastic analyses for managing risk of delay in Duri oil construction projects, Indonesia

Pages 711-731 | Published online: 19 Aug 2019
 

Abstract

This article objective was to identify, assess, simulate, and mitigate risks of delay for the construction of new pressure maintenance (NPM) project located in Duri, Indonesia, based on the combination of stochastic and sensitivity analyses. These both analyses methods are not new but relatively unique to be applied in the area of oil industry especially in Indonesia in generating specific result findings. There were identified 16 major activities are sensitive causing the construction delay. Five significant risks such as; delay in procuring labors, material, and equipment, as well as changes in design and specifications, contributed to the project delay. Based on the stochastic risk analyses, it was identified that an 80% probability of the project would delay for 48 working days. These risks were classified as a high-risk project (delay > 20% from the initial construction project schedule). After conducting risk simulation and risk mitigation measures there were 80% probabilities for reducing the construction delay up to 52.08%. The application of these methods and 6 stages in managing risks would be as an important reference for the oil industry stakeholders in the identification, assessing, and mitigating any possible delays and risks during the construction phase systematically.

Subject classification codes:

Acknowledgment

The author thanks Mr. Sukirno, Mr. Rizki Ramadhan Husaini, the PT Chevron Pacific Indonesia, BPS and the Civil Engineering Department University of Riau for assisting the author in collecting data, developing simulation and supporting in developing this research.

Disclosure statement

No potential conflict of interest was reported by the author.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 158.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.