7,658
Views
4
CrossRef citations to date
0
Altmetric
Articles

Introduction of a digital maturity assessment framework for construction site operations

, , &

Figures & data

Figure 1. Research design.

Figure 1. Research design.

Table 1. Defined assessment areas for construction site operations (research question one).

Figure 2. Organizational model for construction sites (adapted from Scott Citation2003; Rolstadås and Schiefloe Citation2017; Lin et al. Citation2007).

Figure 2. Organizational model for construction sites (adapted from Scott Citation2003; Rolstadås and Schiefloe Citation2017; Lin et al. Citation2007).

Table 2. Defined assessment criteria for construction site organizations (research question three).

Table 3. Digital maturity assessment framework for construction site operations.

Figure 3. Quantitative case study results (line profile displays area average score; scale figures represent digital maturity levels: 0 = Initial, 1 = Digitization, 2 = Digitalization, 3 = Digital transformation).

Figure 3. Quantitative case study results (line profile displays area average score; scale figures represent digital maturity levels: 0 = Initial, 1 = Digitization, 2 = Digitalization, 3 = Digital transformation).