4,673
Views
1
CrossRef citations to date
0
Altmetric
Research Articles

A critical review and comparative analysis of cost management on prefabricated construction research (2000–2022)

, , &
Pages 997-1006 | Received 23 Sep 2022, Accepted 15 Mar 2023, Published online: 31 Mar 2023

Figures & data

Figure 1. Timeline for CMPC.

Figure 1. Timeline for CMPC.

Figure 2. Three-stage review structure.

Figure 2. Three-stage review structure.

Table 1. Search results for keywords.

Figure 3. Variations in the number of CMPC-related papers (2000–2018).

Figure 3. Variations in the number of CMPC-related papers (2000–2018).

Figure 4. Clustering structure of document co-citation analysis.

Figure 4. Clustering structure of document co-citation analysis.

Figure 5. The research work breakdown structure (R-WBS) of current CMPC-related research.

Figure 5. The research work breakdown structure (R-WBS) of current CMPC-related research.

Table 2. Main document co-citation clusters for CMPC-related research.

Figure 6. Future research directions in CMPC research domain.

Figure 6. Future research directions in CMPC research domain.

Data availability statement

All data, models, and code generated or used during the study appear in the submitted article.