Investigation of the effect of the inspection intervals on the track geometry condition

, , &
Pages 1138-1146 | Received 17 May 2019, Accepted 03 Sep 2019, Published online: 20 Nov 2019

Figures & data

Figure 1. Different maintenance zones based on limits.

Figure 1. Different maintenance zones based on limits.

Figure 2. Examples of UH1, UH2 and critical defects of the longitudinal level.

Figure 2. Examples of UH1, UH2 and critical defects of the longitudinal level.

Table 1. Maintenance limits defined in the European standard EN 13848-5 and in Trafikverket (Citation2015).

Figure 3. Schematic description of preventive and corrective maintenance actions.

Figure 3. Schematic description of preventive and corrective maintenance actions.

Table 2. Three defined track geometry states based on the maintenance limits.

Figure 4. Histograms of the initial degradation value and degradation rate.

Figure 4. Histograms of the initial degradation value and degradation rate.

Table 3. The results of parameter estimation for lognormal distributions.

Table 4. Parameter estimates for recovery model.

Figure 5. (a) Box plot of the recovery values for different numbers of tamping interventions, (b) Box plot of the recovery values for different tamping types.

Figure 5. (a) Box plot of the recovery values for different numbers of tamping interventions, (b) Box plot of the recovery values for different tamping types.

Table 5. The ordinal logistic regression results for the longitudinal level defects.

Figure 6. Relationship between the standard deviation of the longitudinal level and the probability of no defect, at least one UH2 defect, and at least one critical defect in a track section.

Figure 6. Relationship between the standard deviation of the longitudinal level and the probability of no defect, at least one UH2 defect, and at least one critical defect in a track section.

Table 6. Effect of the inspection interval on the percentage of time spent in the different longitudinal level states.