1,446
Views
10
CrossRef citations to date
0
Altmetric
Articles

Unlocking the potential of early contractor involvement in reducing design risks in commercial building refurbishment projects – a Western Australian perspective

, &
Pages 439-456 | Received 07 Apr 2017, Accepted 26 Jun 2017, Published online: 06 Jul 2017
 

ABSTRACT

The commercial refurbishment sector is widely gaining popularity, particularly in industries such as the Western Australian construction industry in order to effectively house commercial businesses and operations. Unfortunately, commercial refurbishments have long been characterised by its added complexity, risk and uncertainty facing the management and delivery of such projects. The uncertainties are largely attributed to the segregated relationship between design and construction processes. Among a multitude of options in procuring refurbishment projects, the early contractor involvement (ECI) emerged as a procurement route that bridges this typical gap between design and construction, promotes a collaborative design process and offers opportunity for risk mitigation and certainty of delivery. Whilst appearing as a worthy candidate to procure refurbishment of commercial buildings, anecdotal evidence have indicted the potential of ECI to reduce design risks through synergising the contractor’s construction expertise into the design process. In light of this, the paper aims to report the findings from a recent research project conducted in Western Australia on this topic through case study approach. The findings revealed the specific points and activities during design of commercial building refurbishment where the contributions of the contractor are optimum in reducing design risks. This is captured in the resultant process map specifically developed for this type of projects under the ECI scheme. The process map is expected to further support project teams at the early design stage of a commercial building refurbishment projects to devise a robust strategy to fully benefit from procuring their project through ECI.

Disclosure Statement

No potential conflict of interest was reported by the author(s).

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 336.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.