Abstract
This study surveys the performance of temporary soil nail walls with a maximum height of 29.3 m in the Yas project, located in Tehran. Some numerical models, with various modelling approaches, were developed using finite element software and the proper modelling approaches were specified and verified.The modelling results were analysed and compared with the in situ monitored data. The results demonstrate the model’s horizontal deformations are generally greater than the in situ monitored values. To decrease the differences between models and monitored results, the effect of variations of the soil parameters had been surveyed and the limits of needed variations were specified.
Acknowledgements
This work was accomplished with the support of Pazhoohesh Omran Rahvar Consulting Engineers Co.
ORCID
Zolqadr, Emad http://orcid.org/0000-0002-0852-6782