881
Views
3
CrossRef citations to date
0
Altmetric
Research Article

Co-producing maintenance and repair: hybrid labor relations in water supply in Accra, Ghana

, ORCID Icon & ORCID Icon
Pages 280-302 | Received 23 Apr 2022, Accepted 10 Feb 2023, Published online: 21 Feb 2023

Figures & data

Figure 1. Map of Accra showing Nima and Dodowa, the case study locations.

Figure 1. Map of Accra showing Nima and Dodowa, the case study locations.

Figure 2. Household selling GWCL water in Nima (March 25, 2020).

Figure 2. Household selling GWCL water in Nima (March 25, 2020).

Figure 3. Private water connection in Dodowa supplied by GWCL (March 20, 2020).

Figure 3. Private water connection in Dodowa supplied by GWCL (March 20, 2020).

Table 1. Summary of water infrastructure systems in Nima and Dodowa.

Figure 4. GWCL’s officials repairing a pipeline, Accra–Agbogba junction (December 8, 2018).

Figure 4. GWCL’s officials repairing a pipeline, Accra–Agbogba junction (December 8, 2018).

Figure 5. Duty roster for night shift maintenance and repair in Accra (December 8, 2018).

Figure 5. Duty roster for night shift maintenance and repair in Accra (December 8, 2018).

Figure 6. Private plumber repairing a burst pipeline in Nima (March 10, 2020).

Figure 6. Private plumber repairing a burst pipeline in Nima (March 10, 2020).